Supporting Construction Frame with Low Price, Aoyu Formwork Wholesale Steel Single-Side Bracket

Price $1050.00 Compare
Min Order 1 Ton
Shipping From Beijing, China
Popularity 356 people viewed
Quantity
+-
 

Beijing Aoyu template Co., Ltd.

VIP   Audited Supplier 1 year
Profile Certified by SGS/BV
Yes
One Year
ISO
Steel
Column Formwork
Yes
Customized
Customized
Container
Steel
Aoyu
7308900000
Product Description
Basic Info.
Model NO.DCQ86MaterialSteel 
TypeSingle-sided wall formworkSpecificationQ235B
ColourYellow, Blue or CustomizedTurnover frequency50-80 times
Panel thickness6mmWidth1000-3000mm
Maxmum lateral pressure80 kn/square metreHeight3000-6000mm
Guardrail height1200mmAppliation scopeSubway, basement
Number of Platform3m/layerWidth of Operating Platform900mm
Transport PackagePackage Box, Steel Pallet, Steel Frame, ContainerBrandAoyu
OriginChinaProduction Capacity14000square metre/Month

Product Description


Single sided support template structure
Template composition: template, triangular bracket, anchoring system, support and walking system, connectors

 

Single-sided support template Single-sided support formwork system consists of embedded parts system, walking system and frame body. The embedded parts system includes: anchor bolts, connecting nuts, pressure beams, gaskets, nuts, etc. Heavy-duty universal wheels are used for walking. Scope of application: it has been widely used in subway underground engineering construction, high-speed railway station, one-sided wall of road and bridge slope protection wall, wall formwork of sewage treatment plant, slope protection wall of nuclear power plant and water conservancy project road and bridge, and other concrete engineering supports. The main body of the single-sided support formwork designed and produced by our company adopts truss structure, which has good overall stability, high strength and wide application range. The installation and removal frequency of formwork and support are reduced by adding universal walking wheels. It has the advantages of fast construction speed, high safety, simple technology, strong operability, less labor consumption, high material utilization rate and good appearance quality; It can solve the problems of long working hours, low material utilization rate and poor apparent quality in the traditional construction technology of station side wall, and is suitable for construction methods such as cover excavation and underground excavation, and is widely used in subway, tunnel and other projects.


Assembly diagram of single-sided bracket template



        Single sided support template cross-section
 
  Support anchoring system
 Adjusting the support and walking wheels



Application scenario (case study)

 

 

Packaging:

1. Generally, the total net weight of loaded container is 22 tons to 25tons, which need be confirmed before loading. 
2. Different packages are used for different products: 
---Bundles: Timber beam, steel props, tie rod, etc. 
---Pallet: Small parts will be put in bags and then on pallets. 
---Wooden cases: It is available on customer's request. 
---Bulk: Some irregular goods will be loaded in bulk in container. 
Delivery: 
1. Production: For full container, normally we need 20-30 days after receive customer's down payment. 
2. Transportation: It depends on the destination charge port. 
3. Negotiation is needed for special requirements.

FAQ
Q1:Are you trading company or manufacturer?
A:We are a professional stencil making company, has its own 2 factories

Q2:What do you do?
A:We design and manufacture formwork products used for bridges and tunnels.

Q3:What can you do for us?
A:We offer our suggestions, drawings of formwork layout, and quotations to the owners, design institutes, or contractors of the construction projects.
B:We sell our products to the contractors, building companies, material supplier or trading companies.
C:We support our worldwide peer companies with our outstanding formwork products.

Q4:How long does it take to make a brief design and quotation after we offer the structural drawing?
A:In general, it takes 3~7 days based on specific requirements of construction project.

Q5:How long dose it take to manufacture the products after the signing of contract?
A:In general, it takes 30~60 days based on the type and quantity of products to be produced.

Q6:What is your terms of payment?
A:30% T/T in advance ,balance before shippment.
Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA