Yes
One Year
ISO
Steel
Column Formwork
Yes
Customized
Customized
Container
Steel
Aoyu
7308900000
Product Description
Basic Info.



Assembly diagram of single-sided bracket template

Single sided support template cross-section
2. Different packages are used for different products:
---Bundles: Timber beam, steel props, tie rod, etc.
---Pallet: Small parts will be put in bags and then on pallets.
---Wooden cases: It is available on customer's request.
---Bulk: Some irregular goods will be loaded in bulk in container.
Delivery:
1. Production: For full container, normally we need 20-30 days after receive customer's down payment.
2. Transportation: It depends on the destination charge port.
3. Negotiation is needed for special requirements.
FAQ
Q1:Are you trading company or manufacturer?
A:We are a professional stencil making company, has its own 2 factories
Q2:What do you do?
A:We design and manufacture formwork products used for bridges and tunnels.
Q3:What can you do for us?
A:We offer our suggestions, drawings of formwork layout, and quotations to the owners, design institutes, or contractors of the construction projects.
B:We sell our products to the contractors, building companies, material supplier or trading companies.
C:We support our worldwide peer companies with our outstanding formwork products.
Q4:How long does it take to make a brief design and quotation after we offer the structural drawing?
A:In general, it takes 3~7 days based on specific requirements of construction project.
Q5:How long dose it take to manufacture the products after the signing of contract?
A:In general, it takes 30~60 days based on the type and quantity of products to be produced.
Q6:What is your terms of payment?
A:30% T/T in advance ,balance before shippment.
Model NO. | DCQ86 | Material | Steel |
Type | Single-sided wall formwork | Specification | Q235B |
Colour | Yellow, Blue or Customized | Turnover frequency | 50-80 times |
Panel thickness | 6mm | Width | 1000-3000mm |
Maxmum lateral pressure | 80 kn/square metre | Height | 3000-6000mm |
Guardrail height | 1200mm | Appliation scope | Subway, basement |
Number of Platform | 3m/layer | Width of Operating Platform | 900mm |
Transport Package | Package Box, Steel Pallet, Steel Frame, Container | Brand | Aoyu |
Origin | China | Production Capacity | 14000square metre/Month |
Product Description
Single sided support template structure
Template composition: template, triangular bracket, anchoring system, support and walking system, connectors



Single-sided support template Single-sided support formwork system consists of embedded parts system, walking system and frame body. The embedded parts system includes: anchor bolts, connecting nuts, pressure beams, gaskets, nuts, etc. Heavy-duty universal wheels are used for walking. Scope of application: it has been widely used in subway underground engineering construction, high-speed railway station, one-sided wall of road and bridge slope protection wall, wall formwork of sewage treatment plant, slope protection wall of nuclear power plant and water conservancy project road and bridge, and other concrete engineering supports. The main body of the single-sided support formwork designed and produced by our company adopts truss structure, which has good overall stability, high strength and wide application range. The installation and removal frequency of formwork and support are reduced by adding universal walking wheels. It has the advantages of fast construction speed, high safety, simple technology, strong operability, less labor consumption, high material utilization rate and good appearance quality; It can solve the problems of long working hours, low material utilization rate and poor apparent quality in the traditional construction technology of station side wall, and is suitable for construction methods such as cover excavation and underground excavation, and is widely used in subway, tunnel and other projects.
Assembly diagram of single-sided bracket template

Single sided support template cross-section

Support anchoring system
Adjusting the support and walking wheels

Application scenario (case study)




Application scenario (case study)


Packaging:
1. Generally, the total net weight of loaded container is 22 tons to 25tons, which need be confirmed before loading.2. Different packages are used for different products:
---Bundles: Timber beam, steel props, tie rod, etc.
---Pallet: Small parts will be put in bags and then on pallets.
---Wooden cases: It is available on customer's request.
---Bulk: Some irregular goods will be loaded in bulk in container.
Delivery:
1. Production: For full container, normally we need 20-30 days after receive customer's down payment.
2. Transportation: It depends on the destination charge port.
3. Negotiation is needed for special requirements.
FAQ
Q1:Are you trading company or manufacturer?
A:We are a professional stencil making company, has its own 2 factories
Q2:What do you do?
A:We design and manufacture formwork products used for bridges and tunnels.
Q3:What can you do for us?
A:We offer our suggestions, drawings of formwork layout, and quotations to the owners, design institutes, or contractors of the construction projects.
B:We sell our products to the contractors, building companies, material supplier or trading companies.
C:We support our worldwide peer companies with our outstanding formwork products.
Q4:How long does it take to make a brief design and quotation after we offer the structural drawing?
A:In general, it takes 3~7 days based on specific requirements of construction project.
Q5:How long dose it take to manufacture the products after the signing of contract?
A:In general, it takes 30~60 days based on the type and quantity of products to be produced.
Q6:What is your terms of payment?
A:30% T/T in advance ,balance before shippment.