SWCP intelligent reactive power compensation monitoring device is a protection device suitable for parallel capacitor devices of 35kV and below voltage systems. It has the characteristics of high measurement accuracy, accurate and reliable fault analysis, complete protection functions, and intuitive parameter display. It can collect voltage, temperature and humidity of the system environment, and binary input in real time to realize various protection and control functions. This series of products is also equipped with RS485 serial digital interface, which can realize the communication with the computer. It is widely used in petroleum, chemical, electric power, metallurgy, coal, light industry, textile and other industries.
Feature:
Multifunction meter, used as voltage meter, temperature/humidity controller, time relay etc.
Able to set the parameter while power on; the data not be lost while power-off. Unnecessary to reset.
With 32 ARM, calculating fast and measuring such electric parameters with high accuracy.
Modular and functional design with good software and hardware compatibility.
Colorful 2.4 inch FTF display ,only 5 buttons to simplify the operation
RS485 mode can be used with the host computer (PC) for digital communications, fast-communication, high reliability, support MODBUS protocol;
Unified coding design communication, with good flexibility and scalability characteristics;
Installed in the switch cabinet, but also centralized deployment
To ensure the accuracy of the sampling data and the response speed.
Usage Condition:
Working Power:100-240V/AC,100-240V/DC
Frequency:50Hz
AC sampling voltage output:100V
Imbalance Voltage input:0-100V(external fuse),0-10V(internal fuse)
Voltage Measure Class :0.5 C
Temperature measure range:-40ºC-120ºC,tolerance:±0.5ºC
Humidity measure range :0%RH-100%RH,Tolerance:±3%RH
Output contact capacitance:AC250V/5A
28 invention patents,
24 software copyrights,
22 national standards and 15 industry standards drafting.
Sanhe Power Tech is a member of international committees such as
the International Electrotechnical Commission (IEC)
the Institute of Electrical and Electronics Engineers (IEEE) etc.
The software development system has passed the CMMI evaluation of the American SEI.
There are three main business covering:
A full range of power quality testing and governance products and complete solutions.
Distributed new energy system products and advanced solutions.
Primary and secondary engineering based on "dual carbon" and energy management with standardized and professional engineering services.
Simulation of GRID Reactive Load Flow
Analysis of L-C Circuit Amplitude-frequency Characteristic
Integration & Relay Coordination Reaction
Characteristic Curve of Permanent Magnet Breaker
Sampling & Filtering of Electronic Circuit
IGBT Driving & Protection
PWM Technology
Technology about Semiconductor Forced Commutation
Thermal Simulation & Heat Exchange Design
Feed-forward Second-order Complex Vector Algorithm
3D & Data Simulation
Instrumented IOT Communication
VP Scheduling & Dispatcher
Digital Twins of Micro-Grid & Islanding-Grid
What kind of payment terms can we accept?
Payment in advance,Installment payments,Letter of credit(L/C).
What is the lead time of products?
According to different products, the lead time is different.For standard products like APF,SVG, the lead time is one week.
For customized capacitor bank etc, the lead time is 25 to 45 days.
How to find the product model if you are some demand?
If you need our technical guide,please advise your problem details as much as you can,we can give more reasonable solution.You may provide following drawings or report
Single line drawing
Panel primary scheme drawing
Power quality test report(mainly about harmonics)
How to find the product model if you have details electrical drawings?
Please advise Load name plate, load working condition, existing power factor, target power factor, harmonic times etc Or Rated voltage,compensation capacity, harmonic times(reactor detuning factor), other components etc.How to find the product model if you can not provide enough information?
We can supply your products according to your technical requirement.We can go to your project site and give a professional test report after test.
Why do we choose Sanhe power quality solution?
Sanhe has specialized in over 20 years experience in power quality products and solution. We have met most of power quality problems and gave the solutions.
What kind of technical service does Sanhe provide?
• Project-site power quality test ( or test report from customer)
• Improvement solution and budget
• Product solution and price
• Products supply
• Product commissioning
What kinds of standards does Sanhe product conform to?
Except China standards, Sanhe products also conform to IEC standards including
IEC61921 :2003 IEC61000-4-5:2005
IEC60529:2001 IEC60931-1: 1996
IEC60439-1 :2005 IEC60664-1 2007
IEC60831-1: 1996 IEC61000-4-3/2/4/5/18 IEC61000-2-4
IEC60255 IEC62208 2011…
IEC255-22-1
What is the compensation effect after using Sanhe products?
• Harmonic filtering meets standard
• Power factor is over 0.95,electrical bill saving,low reactive power penalty killing
• Reducing the loss of transformer and line
improve the distribution ability,
prolong the lifespan of electrical equipment
How long is the product guarantee time?
Usually,the guarantee time is one year. However,we can accept over 5 years too. Please contact our sales to get details information.
How to become the distributor or agent of Sanhe brand products?
Sanhe is looking for overseas distributor and agent. If you are interested in it, please feel free to contact us.

