TPU Sheet Extrusion Line Plastic Machinery

Price $20000.00 Compare
Min Order 1 Piece
Shipping From Shandong, China
Popularity 204 people viewed
Quantity
+-
 

Qingdao Suke Machinery Co., Ltd.

VIP   Audited Supplier 13 years
Profile Certified by SGS/BV
SJ-120
TPU
Multilayer
Single-screw
Automatic
Computerized
CE, ISO9001:2008
Customized
New
380V Three Phase
PLC
ABB
Omron
2-3person /Shift
12monthes
SUKE
According to Customers Needs
CE ISO9001
Qingdao China
847780000
Product Description

Instruction:

TPU Sheet Extrusion Production Line--plastic sheet
This production line mainly contains: Material Dehumidifying, loading, dryer, extruder,
Mesh-changing unit, Melt metering pump, sheet mould, calendar, roller-temperature unit, cooling
Unit, edge-trimming, haul-off, winder and so on. According to different size of sheet, the mould
Can be adjusted automatically. Automatical thickness Gauge.

The TPU product is mainly used in field of Aviation, Military, Auto mobile, Battery, Solar energy, trains and so on.

SHEET WIDTH: 1000mm-2000mm
SHEET THICKNESS: 0.5-6mm]



WHY CHOOSE SUKE?
(1) We have experiences in this field since 2002
(2) We have strong technical teams and cooperate with China scientific institution to develop, improve and test our machine, to ensure what customers get are the most reliable machines from China.
(3) We select the most reliable mechanical and electrical parts for our machine with all famous reliable brands, with European CE certificated.
(4) We put our heart into every business with aim of long term cooperation.
(5) We have perfect service system-- Our president is devoting himself to pre-sale, on-sale and after-sale service.

If you want more details about this Tpu sheet extrusion line plaese contact us.
 
No.Machine listAmount
1Automatic loading machineone set
2SJ90/30 singel screw extruderone set
3Coat hanger type extruding mouldone set
4Three rollersone set
5Cooling frameone set
6Haul-off unit and side-cutting unitone set
7Cutting machine (Shears)one unit
8Frame of transporting rollsone unit


TRADE TERMS
Payment Term: 30% for prepayment by T/T, 70% for balanced payment by T/T, or L/C can be acceptable
Delivery Time: 40 days after receipt of prepayment.
Packing Method:  Packing film or wooden case
Guaranteed Time:  12 months
MACHINERUNNING TEST AND AFTER SERVICE
When machine finished, we will invited client come to our factory to check the machine and do the machine test. If machine is ok, then client pay for the balance. And inspect machine load the container.
When machine arrives client's factory, if client needs, we will send 1-2 engineer to client's factory do the machine installation and running test, and also train the local worker how to operate and maintain the machine. It is chargeable.
If have any question or problem on machine operation or maintain, welcome to contact to us by email or calling. We stand by 24 hours. 










Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA