

Because the fuselage is small and flexible, the tractor is more suitable for driving and operating in various road conditions and occasions in the wild, villages, etc. Rural hutongs and farmyards can enter the well.
1.It can drilling on hard rock layerand it can work efficiently under various geological structures.
2. It is the most popular machine meeting most requirements for a combination drilling machine able to complete rural water supply holes in sediments and hard rock.
3.Weighing about 2200kg that allows it to be pulled by a pick-up it is packed with features.
4.The machine is compact in structure and convenient to carry.
5.The whole machine adopts full hydraulic drive and has low failure rate.
6.The tower assembly has a hydraulic compensation mechanism.When the tower is grounded during construction, the bearing capacity is greater and the stability is higher.

The weight | 7.2T | Drill pipe diameter | Φ76 Φ89 mm |
The hole diameter | 140-325mm | Drill pipe length | 1.5m 2.0m 3.0m |
Drilling depth | 300m | Rig lifting force | 18T |
One-time advance length | 3.3m | Rapid rise speed | 22m/min |
Equipped capacitor | 66.5kw | Fast feeding speed | 40m/min |
Hoisting force of winch | 2T | The penetration efficiency | 15-35m/h |
Using air pressure | 1.7-3.0MPA | Swing torque | 5700-7500N.m |
Air consumption | 17-36m³/min | Dimension | 2500×2000×2800 |
Swing speed | 45-70rpm | Equipped with hammer | Medium and high wind pressure series |
The engine brand | Yiqi engine |

![]() | ![]() |
![]() |








Q: Are you original manufacturer? | Q: Which payment terms are available to us? | Q: Which Incoterms 2010 terms can we work? |
A: Yes, we JCDRILL is a official leading manufacture in drilling machinery in China and we have the whole series products you need. | A: T/T term or L/C term. On T/T term, 30% down payment is required in advance, and 70% balance shall be settled before shipment. On L/C term, a 100% irrevocable L/C without "soft clauses" can be accepted. | A: We JCDRILL are a professional and international company, accept all Incoterms 2010 terms, normally we work on FOB, CIF, CFR, CIP. |
Q: How long will the delivery time take? | Q: How about after sales service? | Q:Spare Parts When You Need Them |
A: Normally mud pump products will take about 3-15 days to produce the ordered machines. Most of the time, we can have an immediate delivery of our regular machines in 15 days. | A: 365×24 Year-round Service | A:We have spare parts centers across continents that stock specialist spare parts. We promise that spare parts will be delivered within 72 hours or no more than one week. |

![]() TWD CWD200 Crawler Type Drilling Rig for Drilling 200m | TWD![]() TWD TWD200 Trailer Type Drilling Rig for Drilling 200m | ![]() CSD300A Truck Type Drilling Rig for Drilling 300m |