Textile Calender Machine for Textile Finishing

Price $41600.00 Compare
Min Order 1 Piece
Shipping From Shandong, China
Popularity 305 people viewed
Quantity
+-
 

SHANDONG FINESTART IMP & EXP CO., LTD.

VIP   Audited Supplier 8 years
Profile Certified by SGS/BV
Calender
Automatic
1.5/1.6m
Non-woven Fabric
380V
>2000kg
CE, ISO9001: 2000
1 Year
Customized
New
3-30m/Min
Steam
25days
8.87kw Double Line, Steam or Recycle Oil
10.87kw Double Lines, Steam or Recycle Oil
44.87kw Single Line, Electric Heating Oil
62.87kw Double Lines, Electric Heating Oil
FINESTART
Exporting Standard
8675(4 boxes)/12900(6 boxes)
Jinan, China
Product Description



Introduction

  1. The machine is used for processing cotton and cotton-blend tubular fabric. It equipped with reinforced support plate, 14mm thickness of NOMEX blanket and mechanical folding machine. After processing with this machine, the fabric could reach certain size and smooth appearance.
  2. The Calendering Machine is an economic and easy operation model of textile machine. It can meet normal requirements of fabric processing.
  3. The Maximum width of the fabric: Single 1500mm; Dual 2x800mm
  4. We can provide the following machine based on different heat sources: Steam /   electricity + oil (inner loop).
  5. Steam-heated drying cylinder is 130°C Max and the other model is higher than 180°C.
  6. The machine can process thick fabric (three-layer insulation fabrics).


Design Drawing

Main technical parameter

  • Working width     1450mm(cylinder length 1550mm)
  •  Machine speed    3~30m/min
  • Technical speed (actual speed when working)   15-20m/min(depends on process)
  • Steam box steam consumption  60~100kg/hour 
  • Temperature control precision      ±1
  • Cylinder heating pattern:   steam heating(consumption:4-6Kg/cm²steam 80-100Kg/H;)
  • Electric oil(consumption:25-30KW/H)
  • Circulation oil( consumption 30000-50000Kcal/ H)
  • Machine power        
  • Steam heated  10Kw
  • Electric oil 46 KW/H
  • Circulation oil 10Kw
  • Dimension(L*W*H)   6400X2750X2250mm 
  • Weight     4.5tons
  •  
  • Production Line

Other Products




Payment Terms:


Payment Conditions30% down payment by T/T and the balance payment should be T/T or in irrevocable L/C at sight. 
Delivery time:30-60 days from the date of receiving down payment. All payment should be received before delivery in China.
 
Any questions and requirments,contact us now!


  

 

Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA