Automatic
2m,2.4m,2.8m,3.2m,3.6m
All Fabric
380V
>2000kg
CE, ISO9001: 2000
1 Year
Customized
New
FINESTART
Export Standard
China
84518000
Product Description

Introduction
Name:Relax Dryer/Drying Machine
Application:Name:Relax Dryer/Drying Machine
Used for processing and drying knitted and woven cotton and cotton mixed tubular fabric.
Key Features:
The drying machine is used for drying cylinder and open-width fabric with three-layer net belt.
Drying the fabric, eliminating exceeding water and achieving the natural moisture content of the fabric.
PLC+Inverter control
Conveyor belt made of Teflon material
Design & Drawing
Design, drawing and manufacture according to customer's OEM purchase order.

Typical Products Information
Basic Info & Technical Data
Model | FSHG2800 |
Name | Relax Dryer |
Application | Drying the fabric,eliminating exceeding water and achieving the natural moisture content of the fabric |
Suitable Fabric | Knitted and Woven Fabric |
Layout | Reference SH30-N4 layout |
Max. Working Width | 2400mm |
Machine Speed | 0-50m/min |
Chamber Nos | 4 Sets |
Power Supply | 380V·3P·50HZ |
Weight of Machine | ≈24.5T |
Working Type | Three-layer net belt cycling |
Net Belt Type | Glass fiber with PTFE coated |
Driving Type for net belt | PLC+Inverter control |
Heat-setting Type | Natural Gas heating hot air circulating |
Max Drying Temperature | 160ºC |
Temp. control type | Automatically regulate two chambers temperature as one section |
Length of Chamber | 2.1M |
Thickness of Insulation Board | 105mm |
Machine Dimension | L=12500mm W=4500mm H=3400mm |
Advantage:
- We possess the upgrade and design ability with our professional technical team, your customized design could be changed into drawing.
- With advanced technology and best quality, we make sure that you can get satisfied products based on our pleasant cooperation.
Workshop and Warehouse


Packages and Shippment

Payment Terms
Payment Conditions: 30% down payment by T/T and the balance payment should be T/T or in irrevocable L/C at sight.
Delivery time:30-60 days from the date of receiving down payment. All payment should be received before delivery in China.
Any questions and requirments,contact us now!