Thermostatic Temperature Controller Mixing Brass Angle Valve

Price $1.53 Compare
Min Order 2000 Pieces
Shipping From Zhejiang, China
Popularity 252 people viewed
Quantity
+-
 

Horses (Ningbo) Technology Co., Ltd.

VIP   Audited Supplier 8 years
Profile Certified by SGS/BV
AS-A1014
Ordinary Temperature
Water
Copper
En331
Ceramics
Thread
General
1/2inch
Sanitary Ware, Heating Pipeline
Household, Industrial
>10 Years
Pn16
Brass Copper Zinc Alloy
Brass Copper Zinc Alloy
ISO228(BS2779)
-20c to + 120c
Ce
Brass Ceramic Core
NBR
Chrome Plated
Toilet Flush Brass Angle Valve
ASSUR
Standard Carton Package
1/2"*1/2"
Zhejiang, China
8481804090
Product Description

Thermostatic Temperature controller mixing radiator brass angle valve
Item CodeItem Des. SizeWeight
Grams
Pcs/Ctn
AS-A1014Brass Body,Brass cartridge,
Zinc alloy handle,
BSP thread,Polished 
and Chrome Plated
1/2"165G
180G
200G
100
Product NameToilet brass angle valve   
Material of PartsBrass Body +Zinc Alloy Handle   
Material CompositionCu 59%-1   
CartridgeCeramic Core/Brass Core   
Cartridge Life cycle500,000 cycles of on and off   
Product CraftworkGravity Casting   
Thickness of PlatingChrome>0.25um   
Surface Finishing Polished/Chrome    
Air pressure Testing0.60+/-0.05Mpa   
Water Pressure Testing1.6Mpa   
Max. Flowrate1.5-2.5gmp/m@80psi/5.7-9.5L   
Quality Guarantee3 years   
DN1DNAHL1L1
1/2"1/2"10425276
      
NO.Part NameMaterialNO.Part NameMaterial
1BodyBrass7Plastic GasketABS
2HandleZinc Alloy8Up InsertCeramics
3Accessory CoverStainless Steel9Low InsertCeramics
4ScrewBrass10CirclipStainless Steel
5SeatBrass11WasherSilicagel
6O RingNBR12O RingNBR
 
Basic Dates
1.Brass Material Used     
HPB57%-3
HPB59%-1
CW614N
CW617N
CuZn39Pb3
CuZn40Pb2
Lead Free CopperC3604   
 
2.BasicTechnical Dates     
Type Of Thread Surface Treatment Temperature PressureMedium100% 
Leakage
 Testing
ISO228/BSP/NPT/JISOrgianl Color Nickel Plated
Polished Chrome
0≤T≤ 120ºC1.6MPAWater/oil/gas













Packing:  1/2"    1pc/PE bag; 12pcs/Inner box; 10inner boxes/Carton
         
Shipping:goods will be shipped by sea after 25-35 days after receiving deposit 





OUR SERVICE: 
Samples:  
1) we can make the samples according to customer's samples or designs.
2) Our designer team can finish the samples timely, the exact sample delivery time depends on thesample's style, usually in 15 working days.
3) For New design samples, the buyers have to pay for the relative model fee. (When your order reach a certain amount, we will return back the model fee to you

Price Terms:
FOB, CNF,CIF.etc.

Payment Terms: 
1) T/T, 30% T/T deposit before production, pay the balance before shipment.
2) L/C at sight (for large quantity order)
3) 100% T/T in advance for D/P

Quality control and inspection:

1)  Will be check by QC when Material & accessories inspection up arrival
2)  In line control on Each Step 
3)  Every one valve will be comprehensive review before packing
4)  Item Usage: above 5 years


Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA