WTB01
Stainless Steel
Round Head
Common Bolt
Hexagonal
DIN, GB
A2 A4
Machinery, Chemical Industry, Environmental, Building
Polishing
WORSKEY
Carton Box / Bag +Pallet
M1.5-M52
China
7318151001
Product Description
1. Certification: ISO, ROHS, SGS
2. Available Standard: DIN, ANSI, ASTM, JIS, BSW
3. Strength: Grade 4.8,Grade 8.8,Grade10.9,Grade12.9 A2-70, A4-70, A4-80
4. Finishing: Yellow, blue, white zinc plated, Galvanized,HDG,Chromate,Dacromet
5. Available material: Carbon steel, stainelss steel SS304, A2 ,Stainless steel SS314,A4.
6. Size: M2-M100, Length: 5-300mm, Moq: 500pcs, Port: Shenzhen, Shanghai
7. Available Packing: Plastic bags+Chipboard Cartons+Plywood pallet with Belt &Film.
Product Name | M6 M8 M10 M12 Stainless Steel 304 Stud Bolts Double Ended |
Surface Finishing | Plain |
Material | STAINLESS STEEL 304 |
Measurement System | Metric |
Bolt Style | Stud Bolts Double Ended |
Standard | DIN, GB, ISO, JIS, BA, ANSI, Non-standard |
Length | 30mm,40mm, 50mm, 60mm, 70mm, 80mm, 90mm, 100mm etc |
Thread Size | M6 M8 M10 M12 |
Grade Available | Grade 2-8, 4.8, 6.8, 8.8, 10.9, 12.9, Gr1, Gr2, etc.OEM according to your request |
OEM/ODM | YES |
Application Industry | Electronics, electrical appliances, electromechanical devices, small appliances, drones, instruments, high-speed rail, motor, furniture, medical, sports equipment and other industries etc. |
Material Available | Stainless Steel, Titanium and Titanium AlloyBrass, Carbon Steel, Aluminum OEM according to your request |
Delivery | 5-20days |
Packing | PE/PP Bag + Carton, or as per client's requirement |
Q: Are you trading company or manufacturer ?
A: We are factory and OEM are available
Q: How long is your delivery time?
Q: How long is your delivery time?
A: Generally it is 7-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
Q: Do you provide samples ? is it free or extra ?
Q: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q: What is your terms of payment ?
Q: What is your terms of payment ?
A: 30% T/T in advance ,balance before shippment or L/C.