L4023
ATX
Without Power Supply
ATX
Tower
Steel plate
Black
USB3.0
Back Cable Management
300-400mm
1mm SPCC
Support 7 Fans
Support 360mm in MB Plate
Support 7 Cooling Fans
Upper 400mm
4mm Glass
4mm Glass
4mm Glass
Steel
Max 160mm Cooling Fan
7
830PCS
510mm*320mm*475mm
OEM
Brown Box
405*260*435MM
China
84733090
Product Description
Three Glass panels Gaming case
Structure size | 426*282*453 mm(L*W*H) | |
Packing size | 510*320*475 (L*W*H) | |
Material | Str | 1.2 mm SPCC BLACK |
Side panel | 4 mm Tempered Glass | |
M/B support | ATX/M-ATX/ITX | |
Psu support | ATX | |
DRY bay | 3.5 | 1 |
2.5 | 1 | |
3.5/2.5 | 2*3.5 OR 2*2.5 | |
Fan Bay | Front | None |
Top | None | |
Middle | 3*12 cm | |
Bottom | 3*12 cm | |
Rear | 1*12 cm | |
Liquid cooling support | 240/360 mmm | |
Compatibility | Max Vga length | 400 mm |
Max Cpu height | 160 mm | |
I/O panel | USB3.0*1+USB2.0*2+HD audio+Switch | |
Expandsion slots | 7 |
1*40HQ: 830PCS






We are located at Foshan economy technology development area, with registered capital of RMB 300, 000, 000. The company area is with facilities of 10, 000 square meters. We cover several categories of core business: Computer case, sever case, gaming case, power supply. We are owned by Ahcof Group which is owned by Anhui government, is an old company with 40 years since 1976 year.
We are an award winning brand of computer products with more than 20 years of experience providing consumers greater freedom and convenience.
We own a large number of professional and technical personnel from famous computer enterprises, and we have advanced production lines, large NC injection machines and a full set of testing equipment, with annual production capacity of 1200000 units. And were shipped to US market, South America market with large quantity.
We are specialized in developing the leading technology of computer products, and we enjoy high recognition and reputation of our customers for our R&D ability, high quality, on-time delivery, and good service. Now the company is on the processing of the second phase of the project construction, adding facilities of 10, 000 square meters, which will greatly enhance the capacity.
We are sincerely welcome all parties to work togetherand to create new miracle