Triplex Plunger Pump Ht400 Reciprocating Triplex Plunger Pump Prices

Price $6000.00 Compare
Min Order 1 Piece
Shipping From Shaanxi, China
Popularity 456 people viewed
Quantity
+-
 

Xi'an Boban Oil Tools Co., Ltd.

VIP   Audited Supplier 4 years
Profile Certified by SGS/BV
HT400
24/7
12 Months
CNC Milling
Phosphating
N/a
Cast Steel
27FT
800
400
Piston Pump
Diesel
Mixed Flow Pump
BOBAN & OEM
Wooden Case
4"
China
8431431000
Product Description
HT400HP Triplex plunger pump Technical Parameters
 
Plunger DiameterOutput Per RevDisplacement at Pump Strokes Per Minute/Pinion RPM 
50/229100/457200/194300/1371400/1828
IN(mm)GPR(Ipr)GPM(Ipm)PSI(Mpa)GPM(Ipm)PSI(Mpa)GPM(Ipm)PSI(Mpa)GPM(Ipm)PSI(Mpa)GPM(Ipm)PSI(Mpa)
4*(101.6)0.98(3.7)49(185)8000(56)98(371)6370(44.4)196(742)3150(22)294(1113)2100(14.8)392(1484)1560(11)
4.5*(114.3)1.24(4.7)62(235)6000(42)124(470)5030(35)248(940)2485(17.5)372(1408)1660(11.7)496(1880)1220(8.6)
Note: Nased on 100% volumetric efficiency and 90% mechanical efficiency.

Max horse power: 400HP (298kW)
Max rod load: 100000lbs(45360kg)
Stroke length: 6"(152.4mm)
Gear ratio: 4.57:1
Outlet diameter: L95.25" W64.5" H66" (2420×1638×1676mm)
Weight(Approx.): 10560lb (4800kg) (Include oil tank and skid)


Features

1. Consist of a power end assembly, fluid end assembly and diaphragm connection.
2. The power end adopts worm gear drive with high reduction ratio, stable transmission, long service life;
3. The input shaft of power end is in one direction with the plunger, easy to install and drive the pump. The lubrication oil pump of power end is integrated at the other end of the worm shaft, no need of external lubrication.
4. Pump casing is the lubricating oil tank of power end.
5. Fluid end adopts the separate structure, each plunger has a separate piece of pump head body for replacement, low maintenance cost.
6. There are two different fluid end for (3 3/ 8"/ 4"/ 4 1/2") sizes of plunger for choose to achieve different pressure and flow.
 
FAQ

Q1. How to get an accurate quotation?
A1: Please provide related technical requirements, drawings, pictures, industrial voltage(solid control equipments) and quantity, our team will provide solutions and quotations in time.

Q2. How about your delivery time?
A2: Generally, for spare parts we have regularly stock; for equipments or drilling tools it will takes 20~30 working days after receiving your deposit payment. Accurate delivery time depends on the items and the quantity of your order. 

Q3. What is the warrantee period of the machine?
A3: We can supply 12 Months warranty for our equipments. We provide 7/24 internet or calling service at your convenience, and also our engineers can provide filed installation or services to your place if needed.

Q4. What's your trade terms and payments terms?
A4: We accepted trade Terms: FOB, CFR, CIF, EXW, CIP, FCA, CPT, Express/Air/Sea Delivery; Usually our payment terms are % advance payment, balance before shipping, L/C should be discussed according to actual order. 
 

Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA