GF-DLCTC
Yes
Negotiated
26 Tons
Q235B
2X3kw
6m/Min
200mm-1200mm
5.5kw
20MPa
Parameters May Be Adjusted for Specific Projects
Gaofeiqiaosui
Standard Packaging
12.1m
Luoyang, Henan
8480600090
Product Description
Product advantages: 1. Good quality control, using integral steel formwork design, with high formwork strength and good stability. | ![]() | ![]() |
2. During construction, only the steel rails need to be installed, and after the trolley is in place, the template positioning is fully automatic, making construction fast | ![]() | ![]() |
3. Achieve efficient construction of tunnel trenches and cable trays with good results, with a construction cycle of about 1 day per cycle. | ![]() | ![]() |