NFX-1
Oversea Service
12 Months
Complete Processing
Steam
ISO9001
Automatic
Milk, Yogurt, Milk Powder, Cheese, Dairy Products
Customized
New
Fresh Cow Goat Camel Milk
High Efficiency Low Cost
1 Set
Multifunctional
High Productivity
Complete Processing Line
ANTLER
Wooden Case
500kg - 2000kg/h
China
Product Description



1. Milk weighing tank 2. Milk receiving tank
3. Centrifugal pump 4. Milk separator
5. Vacuum dearator 6. Heat exchanger
7. Outdoor tank 8. Chilling water tank
9. Water chiller 10. Cooling tower
11. Rotor pump 12. Fermentation tank
13. Seed tank 14. Plate pasteurizer
15. Homogenizer 16. Milk store tank
17. Centrifugal pump 18. Mixing tank
19. Emulsify tank 20. Water-powder mixer
21. High level tank 22. Homogenizer
23. UHT sterilizer 24. Aseptic bricks
25. Straw label machine 26. Date printer
27. Carton packing machine
Additional system:
A. Vacuum evaporation system
B. Spray drying system
C. Powder Packing system
D.CIP cleaning system
E.Steam supply system
3. Centrifugal pump 4. Milk separator
5. Vacuum dearator 6. Heat exchanger
7. Outdoor tank 8. Chilling water tank
9. Water chiller 10. Cooling tower
11. Rotor pump 12. Fermentation tank
13. Seed tank 14. Plate pasteurizer
15. Homogenizer 16. Milk store tank
17. Centrifugal pump 18. Mixing tank
19. Emulsify tank 20. Water-powder mixer
21. High level tank 22. Homogenizer
23. UHT sterilizer 24. Aseptic bricks
25. Straw label machine 26. Date printer
27. Carton packing machine
Additional system:
A. Vacuum evaporation system
B. Spray drying system
C. Powder Packing system
D.CIP cleaning system
E.Steam supply system
1. Milk reception or powder & water mixing unit.
This part is to prepare and mix the raw material. If the fresh milk is in urgent need or not enough for production, powder milk can be used to replace it.
2. Mixing and sugar melting unit.
Mixing machine and heat system are needed to melt the sugar and supply hot water, and then before entering the mixing tank (blending tank) for further mixing, the syrup should be cooled.
3. Pasteurizer and homogenizer.
This part is to kill the bacteria, thus ensuring the safety of products.
The homogenizer is used to make the products more homogeneous which can help to improve the quality and prolong the shelf life of products.The degasser is used to remove the air that is mixed in the product. According to different products types and filling types, the pasteurizer is strictly chosen to suit the plant.
4. Storage or yogurt producing unit.
5. Filling or packing unit.We can provide many kinds of filling types, such as plastic bag, PRT bottle, HDPE bottle, glass bottle, gable bottle, and plastic cups and so on. You can choose what you want.
6. CIP cleaning system.
7. After treatment equipments such as conveyer, package or pallet etc.
8. Some assistant equipments like steam boiler, air compressor and cold water unit etc.
9. Materials for the product pipes installation, power pipes installation and also electrical installation.
This part is to prepare and mix the raw material. If the fresh milk is in urgent need or not enough for production, powder milk can be used to replace it.
2. Mixing and sugar melting unit.
Mixing machine and heat system are needed to melt the sugar and supply hot water, and then before entering the mixing tank (blending tank) for further mixing, the syrup should be cooled.
3. Pasteurizer and homogenizer.
This part is to kill the bacteria, thus ensuring the safety of products.
The homogenizer is used to make the products more homogeneous which can help to improve the quality and prolong the shelf life of products.The degasser is used to remove the air that is mixed in the product. According to different products types and filling types, the pasteurizer is strictly chosen to suit the plant.
4. Storage or yogurt producing unit.
5. Filling or packing unit.We can provide many kinds of filling types, such as plastic bag, PRT bottle, HDPE bottle, glass bottle, gable bottle, and plastic cups and so on. You can choose what you want.
6. CIP cleaning system.
7. After treatment equipments such as conveyer, package or pallet etc.
8. Some assistant equipments like steam boiler, air compressor and cold water unit etc.
9. Materials for the product pipes installation, power pipes installation and also electrical installation.

item | value |
Applicable Industries | Food & Beverage Factory, Food & Beverage Shops |
Showroom Location | None |
Video outgoing-inspection | Provided |
Machinery Test Report | Provided |
Marketing Type | Ordinary Product |
Warranty of core components | 1 Year |
Core Components | PLC, Engine, Gearbox, Motor, Gear, Pump |
Condition | New |
Place of Origin | China |
Brand Name | ANTLER |
Voltage | 380V 50HZ |
Power | 55000 |
Weight | 1600KG |
Dimension(L*W*H) | Customized |
Warranty | 1 Year |
Key Selling Points | High Productivity |
Application | Dairy Products |
Raw material | Fresh Cow goat camel Milk |
Final product | Flavoured Milk Yogurt Milk Powder |
Capacity | 500-10000L |
Function | Multifunctional |
MOQ | 1 Set |
Processing Types | Complete Processing Line |
Feature | High Efficiency Low Cost |






Antler Automation Equipment (Suzhou) Co., Ltd. focus on innovative food and beverage process technology and mechanical manufacture technology, from standard plant systems to customized solutions, designed to meet optimum hygiene and quality standards, while operating efficiently and sustainably. As a true producer and partner of clients and relations who are professionally involved in food and beverages project and who rely on continuous precision and high services for project design, equipment manufacturing and commissioning, and also staff training .Our technical expertise is complemented by project management, planning and cost control services to help our customers achieve flexible and cost-effective food production.



1. Are you a manufacturer or a trading company?
We are a professional manufacturer of food & beverages processing machine
2. What's the price of your machines?
Please contact us for further communication, we shall make you an offer.
3. What is the payment terms?
T/T or L/C; by T/T 30% as down payment, 70% by T/T before delivery, 100L/C at sight before shipment.
4. What is the supply scope?
We can provide you with turnkey project for complete dairy,fruit and vegetables processing machine.
Along with project design and basic formula.
5. What is the workshop size required?
The production line can be put in straight line and also can change the direction according to your
factory size. We can design the layout according to your factory size.
6. What's your Warranty time?
Our warranty is 2 years after delivery.