GBC-400
1 Year
PE Film Blowing Machine
Plastic
400mm
45mm
Automatic
Computerized
4T
CE, ISO9001:2008, TUV
LDPE0.015-0.20mmhdpe0.005-0.05mm
5200*2900*4500mm
28kw
5500kg
100-600mm
30-50kg/Hour
28: 1
2
Provided Engineers Available to Service Machinery
One Year
SILSTAR
Wrapping Film Packing or Packed in Wooden Case
CE, ISO9001: 2008, SGS, TUV
Jiangyin City Jiangsu Province
84773090
Product Description
Extruder from silstar company can blow all sizes of LDPE. HDPE and LLDPE plastic film which is used in packing food,
The general merchandise, chemicals textile, shopping bags, gift bags, and industrial packing.
The barrel of the machine and the screw rod are accurately made of quality 38 CrMoAl nitro-alloy.
It is anti-abrasion and corrosion resistance

Model | GBC-400 | GBC-600 |
Screw diameter | 45mm | 55mm |
Screw length proportion | 30:1 | 30:1 |
No.of Heads | 2 | 2 |
Film-blowing width | 100-400mm | 100-600mm |
Film-blowing thickness | LDPE0.015-0.20mm HDPE0.008-0.05mm | LDPE0.015-0.20mm HDPE0.008-0.05mm |
Output | 20-70kg/hour | 40-100kg/hour |
Total power | 28kw | 45kw |
Dimension of the machine | 5000×2500×3800mm | 5200×2900×4500mm |
Total weight | 3500kg | 4800kg |




Silstar machinery founded in 1997, covers an area of 32,000 m2,we focused on film blowing machine, bag making machines for plastic bag and compostable bag. We have obtained 2 invention patents on garbage bag making machine and labeling machine, 13 utility model patents, which has become one of the leading companies in this industry. By now It has already got the CE certification, ISO9001 quality certification, and ISO45001 safety management certification.
SILSTAR workshop pictures:



1. Q: How long will your engineer reach our factory? A: Within 7-15 days after the machine arrives at your factory. |
2. Q: How many days will you finish installing? A: We will finish installation and training within 3-7 days. |
3. Q: What should we charge for your engineer? A: You should charge for the cost of our engineer's visa, round trip tickets, accommodation, and also their salary of 100USD one day per person. |
4. Q: How long is your machine's warranty period? A: All our machines have one year guarantee, starting from the finished installation. |
5. Q: How could we do after one year warranty period? A: We also can do service for you, but you need to pay the salary for my technician 100USD/day. |
6. Q: How could we do if the parts are broken within the warranty? A: We would express the free replacement parts during the warranty date. |
7. Q: Does your engineer understand English? A: Our engineer understands a little English. All of our engineers have more than five years machine installation experience. |
8. Q: How many workers do we need to run those machines? A: Usually need one person to operate the machine. |
9. Q: How do we solve the machine problem after your engineer leaves? A: Generally speaking, there will be no problem after finishing the installation. In case you have any problem. You can contact our sales at any time. Our engineer will take a solution video according to your description. |
10. Q: How can I visit your company? A: It takes 30 minutes by train from Shanghai to our factory. |