Two Component Silicone Sealant Insulating Glass Dosing and Sealing Pump Machine

Price $6500.00 Compare
Min Order 1 Set
Shipping From Shandong, China
Popularity 364 people viewed
Quantity
+-
 

Jinan DETEK Machine Co., Ltd.

VIP   Audited Supplier 6 years
Profile Certified by SGS/BV
ST02
CE
Pneumatic Switch
Air Motor
Hasco
10:1
0.6-0.8MPa
1750×950×1980mm
Insulating Glass Production Line
Vertical
New
One Year Guarantee, All Life Long After Service
One Year
DETEK
Seaworthy Package
China
8464901900
Product Description

Application


Model ST02 sealant spreading machine is made with the latest domestic and international technologies, which applies to the sealing and spreading of secondary sealant. A /B pump adopt S. Korea pneumatic air motor, which works sensibly and reliably. Its unique adjustable proportioning mechanism meets the rigorous requirements for double constituent sealant proportion to maximum extent, with a smooth sealant flow, good coating effect and high production efficiency as well.



Feature
  1. Suitable for mass production of insulating glass and curtain wall
  2. Pneumatic control, easy for operation
  3. A/B air motor adopt American advanced technology, S. Korea brand air motor
  4. Integrated structure of A/B sealant pump, avoid sealant leakage
  5. Special device to avoid A/B sealant pump running idle.
  6. Special one-way value in high pressure pump, sealant output smoothly, suitable for all kinds of sealant, avoid incomplete mixing.
  7. Multi filter system to keep clean of sealant
  8. Stainless steel mixer and unique sealing gun, guarantee the sealant mixing effect
  9. One-way valve is made of high wear-resistant material, long life time
  10. The rotating arm is equipped with universal device, flexible and portable
Parameter
Mixing ratio6:1-14:1
Sealant output4-10L/min
Max. dispensing pressure30Mpa
Air supply0.8-1.0 Mpa
Air consumption0.8M3/min
Diameter of A/B drum570mm/280mm
Dimension1750×950×1980mm
Weight510Kg

Brand parts list
NameBrandCountry
A/B air motorHasco/YLS. Korea
Safety valveHascoS.Korea
Pressure gauageDeltaTAIWAN
Sealing gunSelf-madeChina







Mostly asked questions below:

1. What is your soonest lead time?
  A: 60 days for whole production line, 30 days for single machine.  Special requirement pls check with sales.

2. How do you arrange the shipment?
  A: all machines fit GP for sea freight saving. Seaworthy package, workshop container loading, safe arriving.

3. Guarantee ?
  A: One-year guarantee (wearing parts are out of this range). Life long service. DETEK will send engineers for service upon request onsite.

4. How we can install the machines?
  A: Installation included; however, customers need to pay our engineer's round way air tickets, local transportation and accommodation (hotel and food).
The installation should be finished within 15 days, and will be charged 60USD/engineer/day.

5. How about the after service?
  A: Spare parts within 72 hours.
     Experienced technical sales sort out most of your questions.
    Tens of service engineers ready for on-site service and instruction.
Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA