UTT10 connecting base
Online Guide Service or Provide Technicist
Medium Carbon Steel
0.705kg
DIN, ANSI, GB, JIS, Bsw
Galvanized Sheet
Rivet
utterly
Carton+Pallet/Wooden Case
carbon steel
China
7326909000
Product Description
UL/FM Electro-Galvanized Carbon Steel Structure Attachment Adapter in Seismic Sway Bracing System


Structural Attachment
Function- Multi-functional attachment to building structure or braced pipe clamps.
Size-One size fits braced pipe up to 8", with 1/2" bolt hole for structure.
Finish-Zinc plated. Other finishes upon request
Material - Carbon Stee
lInstallation- It is the structural or transitional attachment component of a longitudinal or lateral sway bracing assembly. To install, insert the bracing pipe, or channel or angle bar into the clamp, and tighten the set bolt until set bolt head breaks off.
Qualification - Comply with CE and FM and UL listed.
Max Load (Lateral and Longitudinal) -2015 Lbs.
Function- Multi-functional attachment to building structure or braced pipe clamps.
Size-One size fits braced pipe up to 8", with 1/2" bolt hole for structure.
Finish-Zinc plated. Other finishes upon request
Material - Carbon Stee
lInstallation- It is the structural or transitional attachment component of a longitudinal or lateral sway bracing assembly. To install, insert the bracing pipe, or channel or angle bar into the clamp, and tighten the set bolt until set bolt head breaks off.
Qualification - Comply with CE and FM and UL listed.
Max Load (Lateral and Longitudinal) -2015 Lbs.


UL Maximum Design Load | ||||
Brace Member | lbs. | KN | Wt. Each | |
lb. | kg | |||
1" SCH40 pipe | 1885 | (8.38) | 1.54 | (0.7) |
FM Maximum Design Load | ||||||
Brace Member | Horizontal load ratings installation angle 30°-44° | Horizontal load ratings installation angle 45°-59° | Wt. Each | |||
Ibs. | kN | Ibs. | kN | lb. | kg | |
1" SCH40 pipe | 1490 | (6.62) | 1980 | (8.80) | 1.54 | (0.7) |


The connection mode of base part connected with the building. The connection between the base part and the building is completed. The accessories connected with the base part is sch40 1-inch pipe. The pipe must be clamped to the bottom of the base part, then fixed with the shear bolt. Tighten the shear bolt until heads break off. Tighten the shear bolt until heads break off.

Q: Are you trading company or manufacturer ?
A: We are factory.
Q: How long is your delivery time?
A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
Q: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us as below: