ATV-200 WOLF
Disc Brake
200CC
4 Stroke
Gas / Diesel
>75 km/h
Chain Drive
Automatic
Upbeat
CE
New
UPBEAT
Carton
Yongkang City Zhejiang China
Product Description
Engine: | 200cc engine, oil-cooling electric start and pull start |
Max Power: | 7.5kw/7500r/min |
Max Torque: | 11kw/6000r/min |
Bore and stroke(mm x mm): | 62.5X57.4 |
Transmission: | CVT,(R-NF) |
lgnition: | CDI |
Rear swingarm: | Upgrade rear swingarm and rear axle system |
Frame: | New upgrade heavy duty frame |
Drive: | Chain drive |
Rack: | Steel frame and backrest and amrest |
Seat | High quality soft seat with backrest |
Exhaust | High quality exhaust pipe |
Suspension Front | High perfommance double shock absorber with air bag |
Suspension Rear: | High performance upgrade rear damp shock absorber |
Brake: | Front and rear disc brake |
Tre size: | 10 inch wheel, wide tire with deep teeth and rim cover |
Matching: | 10 inch Alloy wheel,capstan,Front and rear steel shelves |
Max load: | 300kgs |
Light: | LED head light |
Packing: | Steel frame+carton |
Carton size: | 1480x840x760mm |
Container loading quantity: | 22PCS/20FT(Rear tire outside), 66PCS/40HQ(Rear tire outside), |







Our other product series:





More information of our company:
1, For making good quality frame body of dirt bike and atvs,we have 5 sets of manipulators,20 sets of punchs,5 sets of pipe bending machine,5 sets of pipe cut machine,15 sets of welders etc,those machines could make sure our frame body looks good and quality good.
2, For good looking design of spare parts,we have 10 sets of CNC machining center for making all aluminium and cnc spare parts for motorcycles.
3,For meeting colorful demand of all metal parts,we have a workshop for spraying frame and other metal parts.
4,For meeting more customer need in style,we invest and develop the plastic cover and frame body style,as we develop everyyear,we have got many style for selling,including atv 49cc-250cc ,dirt bike 49cc-250cc ,electric dirt bike and electric atv.if customers need to making new style bikes,we could help you.
5,For quick production,we have more than 100 workers,3 sets of assembling line,one preassemble work-term ,one packing working-term etc.
we welcome customers have good thinking for business and style come to talk orders and others with us.