Used 2000HP 7000m Zj70d Zpec Electric Drive Land Rig in Stock for Sale

Price $6000000.00 Compare
Min Order 1 Piece
Shipping From Beijing, China
Popularity 379 people viewed
Quantity
+-
 

SAINTWAH INC.

VIP   Audited Supplier 2 years
Profile Certified by SGS/BV
ZJ70D
Provided
1 Year or 2000hours
Casting
Sand Blast
Vacuum
Cast Steel
Zj70d
Zj70dB
SAINTWAH
Skid
8, 350 x 2, 400 x 3, 000 mm
Saintwah Inc.
8207801000
Product Description

ZJ70 2000HP/4500kN Conventional Land Drilling Rig

   Product introduction   

 

The land drilling rig is used for oil and gas exploration and development on wells that are 4500- 7000m (drill pipe 4 1/2") or 4000-6000m (drill pipe 5") deep. Maximum drilling depth 7,000 m.

1. The basic structure, design, and manufacture specifications are according to international standards, including API, IEC,and HSE.

2. The rig driving model could be VFD, mechanical orcombined drive, client could require the rig model.

3. The rig substructure model could be box-on-box, swing-upor hydraulic cylinder raising, with compact structure.

4.Drilling rigs can choose DC drive, AC drive, mechanical drive drive and hybrid drive solutions, which can be configured according to customer needs.

5. All systems and equipment in this drilling rig adopt high-temperature resistant components and air cooling systems for greater effectiveness.

    technical parameter   

 

 
QUOTATION LIST
Q
S/NProduct NameDescriptionQtyUnitTypeVendor
1Lifting system1set  
1.1Crown blockMaximum hook load 4500KN Number of pulleys 7 Main pulley outer diameter (1)1524mm (60") 7pcs Wire rope diameter (1)38 mm (1-1/2") This crane complies with API-4F1setTC450ZPEC
1.2Travel blockMaximum hook load 4500KN Number of pulleys 6 Pulley outer diameter (1)1524mm (60") Wire rope diameter (1)38mm(1-1/2") This tour car complies with API-8C1setYC450ZPEC
1.3HookMaximum static hook load 4500KN This large hook complies with API-8C1setDG450ZPEC
1.4SwivelMaximum static hook load 4500KN This faucet complies with API-8C1setSL450LSPE
1.5Mast• Maximum static hook load (no wind, no standing root 6x7 rope tie) 4500kN • Derrick working height 45m • Derrick top span Front/side 2.2m/2.2m • Derrick bottom span 9m • Second platform working height 26.5m; 25.5m; 24.5m •Two-layer platform standing capacity 5"-28m standing root 7000m • Wind load capacity Non-working state (no hook load, no standing root) 38.6m/s Non-working state (no hook load, full root) 30.7m/s Lifting derrick (no hook load, no standing root) 16.5m/s This derrick conforms to API-4F1setJJ450/45-KZPEC
1.5.1Casing stabbing board 1setMechZPEC
1.5.2Aviation warning light 1set incl
1.5.3lightning rod 1set incl
1.5.4  2set ZPEC
1.6Raising wireropeConsists of 2 lifting ropes. It is used for lifting and lowering derricks and bases1set72-6x84WSNS +IWR1770, L=55400BOMCO
1.7Deadline anchor 1setJZG41ZHONGHENG
1.8It 1t Air winchQJ-12set JULING
1.9Substructure• Drilling rig height: 9m • Turntable beam load: 4500kN • Root load acting simultaneously with turntable load: 2200kN •Lower span of supporting derrick: 9m • Vertical root box capacity: 5''28 root 7000m • This base conforms to API-4F1setDZ450/9-SZPEC
1.9.1Hydraulic buffering deviceIt is composed of hydraulic cylinder, hydraulic pipeline and quick connector. It is used for cushioning when lifting and lowering derricks and bases.1set ZPEC
1.9.2Leveling jackFor derrick leveling, capacity: 50t2pcsLF100/200LBZPEC
1.9.3Stabilizer device 1set ZPEC
1.9.4
Hydraulic blowout preventer mobile device
Rated lifting force 400x2=800kN Maximum lifting height 4.8m Maximum lifting speed 1.5m/min Rated working pressure 16MPa Rated working flow 120 L/min1setFY-80Y/4.8BAOYE
1.9.5Mud umbrella13-5/8" flared mouth with umbrella1set ZPEC
1.9.6Dog house 1set ZPEC
1.9.7Drill floor mat 1set  
1.9.8Cat walk\1set ZPEC
1.9.9DP rackHeight: 1070mm, length: 9m8set ZPEC
1.10DrawworksThree-shaft winch, fully sealed winch frame, driven by two YZ08 DC motors, the main brake is hydraulic disc brake, the auxiliary brake is electromagnetic eddy current brake, with overhead crane roll valve device, Lebus slotted drum. The winch complies with the API spec7K specification and is marked with API. Maximum input power 1470kW Maximum fast rope pull force 485kN Wire rope (1)38mm winch gear number 4 gears, stepless speed regulation1setJC70DZPEC
1.10.1Hydraulic disc brakeNumber of normally open working calipers6, Number of normally closed working calipers2, Brake disc diameter and thickness 1650x76mm; The rated pressure of the disc brake system is 9MPa, the maximum positive pressure of one side of the working gear is 75kN, the maximum positive pressure of the safety gear is 90kN, the cooling method is water-cooled, and the disc brake lever is required to be electronic, and the disc brake handle can be self-locked at any position.1setDBS75BOKE
1.10.2Disc brake hydraulic stationThe disc brake hydraulic station adopts the form of air cooling, adapting to the ambient temperature of 60-70 degrees, radiator and fan assembly, using overhead type, external heat dissipation. The heatsink is designed with sufficient capacity1set BOKE
1.10.3Electromagnetic eddy current brake• Maximum braking torque: 98000N.m • Cooling mode: water cooling1setSDWS70SHENTONG
1.10.4Cooling deviceIt is composed of vertical radiator, water pump, pipeline, control valve, etc. • Tank volume: 30m31set SHENTONG
1.10.5DC motorDC motor •Rated power: 800kW •Rated voltage: 750V •Rated speed: 970r/min •Rated torque: 8034N.m •Insulation grade: Class H • Water mist protection device is installed at the entrance of the air duct2setYZ08ACRRC
1.10.6Auto-bitIt consists of 1 set of 45kW AC motor, 1 set of gearbox and 1 set of LT600/250T clutch, etc. •Motor Model: M2JA225M4A-WJ41 •Motor Power: 45kW •Motor Voltage: 380V •Motor rated speed: 1480 r/min Speed encoder is installed. The encoder pulse signal output is connected to an explosion-proof cable box with built-in photoelectric isolation. Three sets of velocity pulse signals are isolated to combat harmonic interference.1set ZPEC
1.10.7Oil and air pipelines 1set ZPEC
1.11Combined hydraulic stationAir cooled1set BAOYE
1.12Drilling wireropeAPI Spec 9B compliant • Xilu steel core 2000m;1rolls38-6x19S- IWRC EIPSBOMCO
1.13Electric spooler• Maximum load: 14t • Maximum speed: 5rpm • Motor power: 7.5kW • Equipped with lead rope drum1set ZPEC
2Rotary system1set  
2.1Rotary tableThrough hole diameter 952.5mm Maximum static load 5850kN Maximum speed 300r/min Gear ratio 3.56 Maximum working torque 32362Nm The turntable complies with API-7K1setZP375ZPEC
2.1.1Rotary table bushing• 1 x 2 3/8" to 8 5/8" • 1 x 11-3/4" to 13-3/8" • 1 x 9-5/8" to 10-3/4" • 1 x 20" cannula top1set ZPEC
2.1.2Rotary table independent driveThe turntable independent drive consists of a two-speed gearbox, an inertia brake and cardan shaft, driven by an 800 kW motor with adjustable turntable speeds between 0 and 300 rpm.1set ZPEC
2.1.3DC motorDC Motor • Rated Power: 800kW • Rated Voltage: 750V • Rated Speed: 970r/min • Rated Torque: 8034N.m • Insulation Grade: Class H • Water mist protection device is installed at the air duct entrance1setYZ08BCRRC
3High-pressure circulation system1set  
3.1Mud pump 3setF-1600HLZPEC
3.1.1Mud pump devicePulley, perfusion pump, large base and other slurry pump accessories3set ZPEC
3.1.2DC motorDC motor •Rated power: 800kW •Rated voltage: 750V •Rated speed: 970r/min •Rated torque: 8034N.m •Insulation grade: Class H • Water mist protection device is installed at the entrance of the air duct6setYZ08ACRRC
3.2High pressure manifoldDouble riser, double ground manifold; It is composed of drill platform valve group, ground valve group, high-pressure hard manifold and high-pressure short hose. All gate valves are manual gate valves. • Manifold Inner Diameter: 4" • Working Pressure: 10000psi • Test Pressure: 15000psi • Operating temperature: -29°C-121°C • Working medium: water, drilling fluid, crude oil, cracking oil • Connection method: connected by non • Meet the translation of 5 wells with a spacing of 5 meters.1set: 4"ID, FIG 1003ZPEC
3.3Hose23m, 10000psi2pcs JINGBO
4Low pressure circulation system1set  
4.1mud systemThe mud circulation system adopts vibrating screen, vacuum deaerator, mud cleaner, centrifuge and other equipment for five-stage purification treatment, which can meet the process requirements of drilling fluid circulation, perfusion, aggravation and accident treatment under special circumstances, and the whole system is resistant to high temperature, explosion-proof, anti-leakage and anti-corrosion. •Total system volume: 290m3 •Rated pressure of slurry low-pressure circulation pipeline: 1MPa •Rated pressure of clean water pipeline: 0.5MPa •Weighted mixing system processing capacity: 240 m3/h •Solid control equipment capacity: 2240 m3/h • Mud suction line diameter: 12" • Tank size: 12000mmx3000mmx2450mm • Overflow pipe to meet the translation of 5 wells with a spacing of 5 meters.1set  
4.1.1Treatment tank• Tank size: 12000mmx3000mmx2450mm4pcs ZPEC
4.1.2Reserve tank• Tank size: 12000mmx3000mmx2450mm1pcs 
4.1.3Drilling water tank• Tank size: 12000mmx3000mmx2600mm1pcs 
4.1.4Aggravation skid 1pcs 
4.1.5Duty houseRoom size: 2400mmx1600mmx2400mm1set  
4.1.6Poor boy• Pressure: 4.0 Mpa • Separator diameter: 1200mmx6000mm • Gas throughput: 25000m3/h • Hydrogen sulfide resistant1set  
4.1.7Shale ShakerThe G-force < of the high-frequency vibrating screen is 7.8g, the amplitude A< 6.5mm, and the maximum processing capacity of a single unit is 60 L/s.3setGX/S-IIICDBOM
4.1.8Vacuum deairser• Capacity 200-240m3/h • Power 22kW+3kW1setHCQ240-BHAILUYA
4.1.9Mud cleaner• Flow rate 220m3/h, cyclone 300x2/100x16, power 2x2.2kW. Sanding swirl barrel 12" x 2, sand removal cyclone barrel 4" x 161setHZQ300x2/100x 16HAILUYA
4.1.10Medium-speed centrifuge• Capacity: 50m3/h • Speed: 1950rpm • Including one vertical liquid supply pump, power: 5.5KW1setLW450-842NAFEIDA
4.1.11High-speed centrifuge• Capacity: 40m3/h • Speed: 3200rpm • Including one vertical liquid supply pump, power: 5.5KW1setGLW500- 1300NAFEIDA
4.1.12Shear pump• Flow rate 120m*h • Head 35m • Power 55kW • Speed 2900rpm1setWJQ5x6-55KWWP
4.1.13Mixing pump• Flow rate 200-270m3/h • Head 25-45m • Power 75kW • Speed 1450rpm2setSB6x8WP
4.1.14Sand pump• Flow rate 200-270m3/h • Head 25-45m • Power 75kW • Speed 1450rpm2setSB6x8WP
4.1.15Metering pumps• Flow rate 40m?/h • Head 14m • Power 15kW • Speed 1450rpm2setSB3x4WP
4.1.16Water Pump• Flow rate 40m?/h • Head 14m • Power 15kW • Speed 1450rpm2setSB3x4WP
4.1.17Mixing hopper• Throughput 200m3/h3setZHP150WP
4.1.18() Agitator (single impeller)• Power: 15kW14setHJB-15ZPEC
4.1.19Agitator• Power: 2.2kW1set ZPEC
4.1.20Rotary mud gunPressure: 1Mpa 3 heads12pcsNJQ-80ZPEC
4.1.21Pill tankElectric type1pcs2M3ZPEC
4.1.22Mud return lineInner Diameter: 12", designed to connect with the flare, including flushing line1set ZPEC
4.1.23Slurry distributorIt is divided into three and fed the feed liquid of the three vibrating screens1set ZPEC
4.1.24Reserve tank• Tank size: 10600mmx3000mmx2450mm4pcs ZPEC
5Power system1set  
5.1Auxiliary generatorVolvo 400KW, 400V, 50Hz.1set  
5.2Generator room10mx3mx3.2m1set ZPEC
5.3SCR/MCC SCR/MCC Electronic Control SystemElectricity: 50HZ, power supply voltage is 600V 3P and 400V/3P+N; Electric control room (1 building, within 12*3*3.1 meters); 2 overhead air conditioners; Set up 4 main generators, 1 auxiliary air compressor and a 600V wiring skylight for network electricity; Supporting 6 SCR transmission cabinets (2 winches, 1 turntable, 1/2/3 mud pumps); 1 set of automatic drilling frequency conversion control cabinet; 1 set of eddy current brake electric control cabinet (provided by brake manufacturer); 6 MCC cabinets (75KW and below pumps are directly started); 1 set of 1250KVA main transformer (600/400V, 50HZ); The terminal outlet board connector adopts China's domestic non-sparking explosion-proof products; The main power distribution devices (air circuit breakers, molded case circuit breakers, miniature circuit breakers, contactors, thermal relays) adopt international brands; The interior and exterior cables adopt Chinese domestic brands. The cable meets the translation of 5 wells with a spacing of 5 meters.1set ZPEC
6Air supply system1set  
6.1Screw compressorWS3710 50HH, displacement 5.8M3/min. 1.05Mpa2set Sullair
6.2DryerModel HDL, rated 0.8-1.0MPa.1set  
6.3Pre-filterMPF-2501pcs  
6.4Post-filterMPF-2501pcs  
6.5Air tankTHE AIR STORAGE TANK IN THE MACHINE ROOM IS 4 M3, THE REAR GAS TANK OF THE DRILLING PLATFORM IS 2.5M3.1set ZPEC
6.6Pipeline assemblyIt is composed of a complete set of pipelines and valves from the air source room to each gas equipment, as well as the connecting pipe fittings, safety valves, filters, etc. between the compressors, refrigeration dryers and gas storage tanks in the air source room. • Main wire diameter: 2" • Working pressure: 1.0Mpa.1set ZPEC
7Driller control system1set  
7.1Driller control house• Driller air control, hydraulic control operation, instrument display, swivel chair, electric heating plate, shouter, single split explosion-proof air conditioner reserved installation position, insulation pad, etc.; • The windows are laminated tempered glass, with wipers, and the indoor electrical explosion proof. • Installation of finger weight meter, rotary tachometer (electronically controlled), turntable torque meter (electronically controlled), type B and hydraulic large caliper torque sensor and meter.1set BODA
7.1.1GaugeIt can display the overhang, well depth, drilling pressure, turntable speed and torque, pump punch (3 sets), pump pressure, casing (throttle manifold) pressure, top drive torque and speed, lifting gear torque, mud tank volume (18 sets), mud return percentage, mud inlet and outlet density (1 set each), total hydrocarbon sensor (2 sets), H2S sensor (2 sets), dead rope fixer sensor and parameter sound alarm, there are 2 sets of manager room monitoring and storage equipment, and can be extended to 3 sets, transmitted by wire. It is required that the instrument in the explosion-proof area adopt explosion-proof equipment, and the box in the explosion-proof area adopts explosion-proof box and connector to ensure the real-time reliable transmission and storage of various parameters.1set ZPEC
7.1.2Monitoring system2 rotatable gimbal cameras mounted on the second floor. One fixed installation is installed in the middle of the horizontal beam of the first section of the derrick for shooting the winch drum. One is installed on the left side of the level beam of the first section of the derrick to photograph the front gate and ramp. Cameras installed on the second floor of the derrick shall not be connected by plug. 4 dynamic 2 static 6 screen display, including all shielded cables. Control system plug-free1set ZPEC
8Lighting system1set  
8.1Lighting systemUsed to provide derrick, base, hydraulic station power, oil-water tank farm, pump room area, solid control system, air source room, electromagnetic eddy current brake, etc. lighting and power, cables include: equipment power supply, lighting cable, control cable. Searchlights including front and rear field bases.1set ZPEC
9Drill floor tools1set  
9.1Hydraulic power tongs• Applicable pipe diameter: 127-203mm • Maximum torque: 125kN.m, requires 7/8 inch hanging rope, length 40 meters at one end to make a chicken heart ring. • Rotate the part to add a shield1setZQ203-125RUSHI
9.2Hydraulic Cat Head• Rated Traction Force: 160kN • Rated Flow: 120L/min • Towing Stroke: 1200mm • Tow Rope: 3/4" Filament2setYM-16RUTONG
9.35t 5t Air winch• Load weight: 5t • Working pressure: 0.8MPa • Rope speed: 12 m/s • Wire rope diameter: (1)16mm3setQJ-5JULING
9.4B B Type tongs• Tail Rope: 7/8" Filament • Strap: 5/8"1pairsQ89-432/90RUSHI
10Auxiliary equipment1set  
10.1Cable trayThe electric control room to the drilling platform area, the electric control room to the mud pump solid control area1set ZPEC
10.2Fuel tank45m3 with pump chamber with elliptical gear flow meter (one Y-filter installed on the 2" inlet main, not connected to 2 pumps)2set ZPEC
10.3Supply hoseOil inlet 2", oil return 2" quantity 1, 40 meters each, and the connecting line of the tank.1set ZPEC
10.4B B type tongs lifting rope5/8"*40m2pcs  
10.5Hydraulic power tong lifting rope7/8"*40m1pcs  
10.6Clamp tail rope7/8"1set  
10.7Traveling block Suspension rope• Diameter 1 1/4"1set  
10.8Safety ropePressed 5/8" rope sleeve, SWL = 5ton30pcs  
10.9Hydraulic shearing rope 2setYB-48 
10.10Assembly accessories 1set ZPEC
10.11Rig skidding deviceIncluding hydraulic cylinder and control system1set ZPEC
10.12Wellhead coverSteel grating with dimensions of 3.5mx4m1set  
10.13Drill floor wellhead coverPatterned steel plate, empty well, 5", 3 1/2" three situations should be equipped1set  
10.14Drill boxDrill sizes: 30", 26", 17 1/2", 12 1/4", 8 1/2".1set  
10.15boxDimensions: 9000mmx2400mmx1200mm2pcs ZPEC
10.16Racking board escape device 2pcsRG10DMITEMAN
10.17Fall arrest device10m-set, 20m-set, 30m two sets4set LEQING
10.18crowbarTwo 1.2m sticks, 1.5m two sticks.1set  
10.19hammer5kg two, 10kg two.1set  
11Add section1set  
11.1Combustion lines1set  
11.1.1Combustion lines8" diameter, flanged ends with a full set of bolts. 8 inch straight pipe 7 meters 13 pieces, 1 meter 3 pieces, 2 meters 3 pieces.100  ZPEC
11.1.2Combustion line elbow120° elbow, 8" line with underwire flange connection change direction6  ZPEC
11.1.3Combustion line elbow90° elbow, 8" line with steel rim flange connection to change direction6  ZPEC
11.2Electronic ignitionVertical type (for the outlet of the exhaust line of the liquid gas separator), including combustion torch and anti-tempering device, to be connected to the 8" exhaust line flange1   
11.3Reverse circulation well pipeline2"-10000PSI, from surface gate set to pressure manifold. 2 5.3m short sections, 35m pipeline, 10 elbows, 12 sets of non.1  ZPEC
11.4TrumpetWith connecting flange, conduit, 12" buckle. 1 pipe with a diameter of 5 meters larger than 350mm, flange (matched with FH35-35) on-site welding.1set ZPEC
11.5TrumpetIncluding connecting flange, 1 pipeline with a diameter of 5 meters greater than 540mm, flange (compatible with FH54-14) on-site welding.1set ZPEC
11.6Drilling water tank• Tank size: 12000mmX3000mmX2600mm, with fire pump 1. Fire pump (head 216m, flow rate 280m'/h 2, hose: length 2150m, 65mm 3, ©©19mm DC water gun 21pcs ZPEC
11.7Domestic water tankDomestic water tank 20m3, leaving 3 2" outlets, without pump. With ball valve1pcs  
11.8Screw conveyorCentrifuge No. 2 to shaker No. 1 and extend another 1 section. 3 each, each about 10 meters long.3pcs  
11.9Rain shelterCovers the entire solid control system with drainage line.1set ZPEC
11.10Cross the axleArranged in the remote console and cable2pcs ZPEC
11.11
The air package is inflated at high pressure
1-0.27/150,15MPa,L-25m1pcs  
11.12Well control pipelinesLiquid gas separator to throttle manifold, 5000 PSI1set ZPEC
11.13Cementing manifoldsFrom the catway end through the ramp to the drill table face is connected to the drill platform manifold. 2"-10000PSI.1set ZPEC
11.14Material room6m container type, including shelves.3pcs ZPEC
12On site test and commissioning 1/ppl  
FOB USD US$  6,000,000
Notes
1. Rig will maintain and repaint before delivery,
2. Rig weight is approx.2300T
3.  Rig quotation is based on FOB.





Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA