Promotional Best Quality 4-8 Tons C frame 4-8 Tons pneumatic Riveting PEM Screw Nuts Fastener Insertion Machine
Product Description
which have involved economic and technical problems, they will join different materials by means of a deep drawing-pressing process, and which do so without damage to the surface, purely by displacing and forming.
2) It assures you with high productive efficiency as well as full process automaticly monitoring and joining strength checking.
3) In the process of pressing , sheet metals of different thicknesses or materials, even with adhesives or other intermediate layers are fully joined.
4) In industrial applications,Its available of clinching for single sheet thicknesses of 0.5 mm up to a total layer thickness of11.0 mm and up to 7500 N tensile strength. In laboratory tests significantly higher values have already been achieved!
Product Main features
1) Compact structure, clean design
2) Increased productivity with automatic feeding system and multi-point riveting
3) Large anti-ejecting forces and anti-torsion torques
4) High flexibility with height-adjustable
5) High stroke frequency High stroke frequency
6) Easy maintenance and changeable
7) Available for riveting nuts diameter larger than M10
Product layout drawing
Technical parameters
Type | ULYP |
Max. pressing force | 40KN |
Power source | Compressed air from air compressor |
Power supply | 220V/ 50Hz |
Max. total stroke | 100 mm |
Compressed air | 5-8 Kg/cm2 |
Weight | 700 Kg |
Performance parameters
Point diameter (mm) | Sheet thickness (mm) | Shear strength (N) | Tensile strength (N) | Punching force (KN) |
Φ3 | 0.5-1.5 | 260-520 | 130-360 | 7-15 |
Φ4 | 0.6-2.0 | 710-1300 | 350-850 | 13-28 |
Φ5 | 0.9-2.5 | 750-2000 | 200-1000 | 15-30 |
Φ6 | 1.0-3.0 | 560-3400 | 300-2200 | 12-40 |
Φ8 | 1.6-6.0 | 510-6200 | 290-2800 | 18-60 |
Φ10 | 1.75-7.0 | 1600-8500 | 800-6200 | 36-105 |
Φ12 | 4.0-11.0 | 2700-10000 | 1100-7500 | 61-125 |
Product applications

Real clinching samples for C frame riveting machine

Packaging & Real photos

Shipping
By sea | Cheapest but longest option 18~30 days by sea delivery for mass shipment |
By air | More expensive than sea delivery, But cheaper than express 5~7 days by air to airport. |
By express | door to door service,the fastest and most expensive one, 3~5 day for DHL /Fedex /UPS/TNT express |

