Viaduct Column Formwork with Adjustable Features

Price $1050.00 Compare
Min Order 1 Ton
Shipping From Beijing, China
Popularity 461 people viewed
Quantity
+-
 

Beijing Aoyu template Co., Ltd.

VIP   Audited Supplier 1 year
Profile Certified by SGS/BV
Column template
Yes
One Year
ISO
Steel
Column Formwork
Yes
Customized
Customized
Container
Aoyu
7308900000
Product Description
Basic Info.
Model NO.AY86,AY106,AY126,MaterialSteel Wood
TypePier pillar formworkSpecificationQ235B
Panel thickness6mmWidth500-6000mm
Maxmum lateral pressure80 kn/square meterHeight2000mm
Guardrail height1200mmAppliation scopeRoads,Railways,Water conservancy
Number of Platform2m/layerWidth of Operating Platform900mm
Transport PackagePackage Box, Steel Pallet, Steel Frame, ContainerBrandAoyu
OriginChinaProduction Capacity14000square meter/Month
 

Product Description

Steel Formwork System

Our steel formwork is renowned for its robust durability and reusability, making it an ideal choice for numerous construction cycles. Easy to assemble and erect, its fixed shape and structure are perfect for projects requiring large quantities of identical structures, such as high-rise buildings, roads, and bridges.
 

Packaging:

1. Typically, the total net weight of a loaded container ranges from 22 to 25 tons, which must be confirmed prior to loading.
2. We use different packaging methods tailored to specific products:
---Bundles: Ideal for timber beams, steel props, tie rods, etc.
---Pallet: Small parts are bagged and then placed on pallets.
---Wooden cases: Available upon customer's request.
---Bulk: Some irregularly shaped goods are loaded in bulk within the container.
Delivery:
1. Production: For a full container, we typically require 20-30 days after receiving the customer's down payment to complete production.
2. Transportation: The delivery time depends on the destination port charges.
3. Special requirements may necessitate further negotiation.

FAQ
Q1: Are you a trading company or manufacturer?
A: We are a professional stencil-making company with two of our own factories.

Q2: What do you do?
A: We specialize in designing and manufacturing formwork products utilized inbridge and tunnel construction.

Q3: What services can you provide us?
A: We offer expert suggestions, comprehensive formwork layout drawings, and detailed quotations to construction project owners, design institutes, or contractors.
B: We sell our high-quality products to contractors, building companies, material suppliers, and trading companies.
C: We extend our support to global peer companies with our exceptional formwork products.

Q4: How long does it take to provide a brief design and quotation after we submit the structural drawing?
A: In general, it takes3
~7 days, depending on the specific requirements of the construction project.

Q5: How long does it take to manufacture the products after signing the contract?
A: Typically, it takes 30~60 days, contingent on the type and quantity of products to be manufactured.

Q6: What are your terms of payment?
A: 30% T/T in advance, with the balance due before shipment.
Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA