GBJZ-150
1 Year
PE
Single-Screw
Inverter
Aluminum Caet Heating Ring
Automatic
Computerized
Customized
CE, ISO9001:2008, TUV
150mm
50-300kg/H
75kw
10000*1500*1800mm
3800kg
One Year
Competitive
Yes
Optional
SILSTAR
Wrapping Film Packing or Packed in Wooden Case
3800kg
China Mainland(Jiangyin)
84778000
Product Description
SILSTAR workshop pictures:










Silstar machinery founded in 1997, covers an area of 32,000 m2, we focused on film blowing machine, bag making machines for plastic bag, and compostable bag. We have obtained 2 invention patents on garbage bag making machine and labeling machine, 13 utility model patents, which has become one of the leading companies in this industry. By now It has already got the CE certification, ISO9001 quality certification, and ISO45001 safety management certification.
This machine can recylcle the waste machine from blowing machine and bag making machine. This machine including main motor, screw and barrel, extruder die, cooling water tank and material cutter machine. The machine can automatic temperature control, cut speed regulation, compact structure, convenient assembly and easy operation. This machine is an ideal equipment for reducing pollution and reducing the cost.

Model | GBJZ-65 | GBJZ-100 | GBJZ-150 |
Screw daimeter | Φ65mm | Φ100mm | Φ150mm |
Output | 15-45kg/h | 20-100kg/h | 50-300kg/h |
Power | 20kw | 35 kw | 75 kw |
Dimension of the machine | 6000×1000×1400mm | 8000×1200×1800mm | 10000×1500×1800mm |
Weight | 1800kg | 2500kg | 3800kg |






1. Q: How long will your engineer reach our factory? A: Within 7-15 days after the machine arrives at your factory. |
2. Q: How many days will you finish installing? A: We will finish installation and training within 3-7 days. |
3. Q: What should we charge for your engineer? A: You should charge for the cost of our engineer's visa, round trip tickets, accommodation, and also their salary of 100USD one day per person. |
4. Q: How long is your machine's warranty period? A: All our machines have one year guarantee, starting from the finished installation. |
5. Q: How could we do after one year warranty period? A: We also can do service for you, but you need to pay the salary for my technician 100USD/day. |
6. Q: How could we do if the parts are broken within the warranty? A: We would express the free replacement parts during the warranty date. |
7. Q: Does your engineer understand English? A: Our engineer understands a little English. All of our engineers have more than five years machine installation experience. |
8. Q: How many workers do we need to run those machines? A: Usually need one person to operate the machine. |
9. Q: How do we solve the machine problem after your engineer leaves? A: Generally speaking, there will be no problem after finishing the installation. In case you have any problem. You can contact our sales at any time. Our engineer will take a solution video according to your description. |
10. Q: How can I visit your company? A: It takes 30 minutes by train from Shanghai to our factory. |