Yarn Waste Recycling Machine for Yarn Making in Rotor Spinning/Textile Waste Cloth Opening Machine/Waste Yarn Opening Machine

Price $36000.00 Compare
Min Order 1 set
Shipping From Shandong, China
Popularity 480 people viewed
Quantity
+-
 

Jinan Morinte Machinery Co., Ltd.

VIP   Audited Supplier 2 years
Profile Certified by SGS/BV
MKS600-400-250
One Year
CE, ISO9001: 2000
New
Online
Mks
White, Grey, Blue or as Request
600mm-400mm
250mm
1000mm
Ie3 Grade
7.5kw
Casting or Iron Tube Roller
500X1000mm
Fabric and Yarn Waste
1.5, 1.09mm Thickness
1+7 Rollers
Opening-Carding
Morinte
Standard Exporting Package
600-400-250
Shandong, China
84451900
Product Description
Hard Waste Recycling Machine/Soft Cotton Recycling Machine  for  Waste Textile/Fabric Waste/Yarn Waste/Used Clothes/Garment Waste Opening and Cleaning

Usage and characteristic

The machine removes impurities in the cotton by using mechanical centrifugal force emerged by high speed revolving of barbed rollers and loosen cotton, then press to flake. It can be used in processing waste fabric, waste yarn, non woven felt, waste garments, old quilt wadding , short floss, broken unginned cotton, jeans, cloth leftover and flax.

 

This machine adopts domestic advance experiences and feature of cotton pressing equipment, which is characterized on reasonable structure, convenient operation, good effect of dust-removing and safe production, with cyclon collecting box to transport material from opening machine to recycling machine, it can also avoid fire during machine running.





Technical parameter: 
 
Model No.MKS600MKS400MSL250x6
Power30kw18.5kw38.5kw
Roller size600mm400mm250mm
Machine width1000mm1000mm1000mm
Capacity350-400kg300-350kg250kg
Weight2500kg1200kg4200kg
 

Export standard package

 

1) wooden case/polywood case

2) plastic foam packing 

3) nude packing


Why Choose Our Company?

1, More Experience Professional Manufacturer.
2, Rich product lines can meet more request.
3, Quickly delivery and Competitive price with high quality.
4 , We can design as request and supply the whole production line for you.

FAQ: 

1. Do you have English manual book?

Re: Yes, we have.Will send it to you with machine delivery.

2. Can we change the voltage?

Re: Yes, please kindly inform me the voltage you need if not 380v

3. How long will you send the machine after payment?

Re: Normally, 20-30 days

4. How can I pay?

Re: By T/T(wire transfer),Western Union, Money Gram, LC 

Message Type
* Message Content
* Name  
* Phone
* Email
* CAPTCHA