YEJ-200L2-4
Industrial, Universal, Household Appliances, Power Tools
High Speed
Three-Phase
Squirrel-Cage
Protection Type
4
Direct on-line Starting
ISO9001, CCC
44.6A
294.3n.M
0.70s
1500
Waland
Plywood Box
390-1480L
China
85015200
Product Description
Huanian Motor has developed YEJ series electromagnetic brake three-phase asynchronous motor to solve the problems of slow braking speed and poor work safety of ordinary motors. This series of motors is organically composed of Y series motors (optional Y2, YVP, YD derived Y2EJ, YVPEJ, YDEJ series motors), disc DC electromagnetic brakes, rectifier power supply and other components. The structure is reasonable, the braking is fast, the work is reliable, and the maintenance is convenient.
According to the braking mode, it is divided into two kinds of power loss braking and energized braking, the insulation level is B class (optional F and H class), the protection level is IP44, and the power level and installation size are in line with IEC and DIN standards.
According to the braking mode, it is divided into two kinds of power loss braking and energized braking, the insulation level is B class (optional F and H class), the protection level is IP44, and the power level and installation size are in line with IEC and DIN standards.















Packaging Materials | Plywood Box/Plastic |
Package Weight | 2,000kg |


Q1:Are you a factory oriust a trading company?
A1. Manufacturer,and we focus on the development and production of electric motors for more than 20 years.
Q2: ls customized service available?
A2: Of course, OEM & ODM both are available.
Q3: How can l get the quotation?
A3. Leave us message with your purchase requirements and we willreply you within one hour on working time. And you may contact us directy by Trade anager.
Q4:Can l buy one as sample?
A4. Yes, of course.
Q5: How about your quality control?
A5: Our professional QC wil check the quality during the production and do the quality test before shipment
Q6: What is your payment term?
A6: 30% T/T in advance, 70% balance when receiving B/L copy Or 100% irrevocable L/C at sight.
Q7: What is your lead time?
A7: About 20-30 days after receiving advance deposit or original L/C.
Q8: What certificates do you have?
A8. We have CE. 1s0. And we can apply for specific certifcate for diferent country such as SONCAP for Nigeia, COl for ran. SAs0 for Saudi Arabia etc.
Q9: What warranty do you provide?
A9. One year. during the quarantee period. we will supply freely of the easy damaged parts for the possible problems except for the incorectoperation. After expiration, we supply cost spare parts for alternator maintenance.
Feel free to contact us!