Shuttle Loom
380V
Non-Computerized
Precision
CE, ISO9001: 2000
1 Year
Non-Customized
New
The Waring Part
Easy to Operate
3000kg
9100*2410*3100mm
1 Year
Hot Product 2019
Provided
Rod Rolling Wheel Transmission
2700/3500
PLC, Bearing, Motor, Gear
Provided
None
1.8-2.7 M/Min
None
The Most Advanced Technology
Zhuding
Zhejiang, China
Product Description
Product Description
Performance and Characteristic:
Wenzhou zhuding machine co ltd making Small cam and connecting rod rolling wheel transmission, which is the most advancedtechnology are adopted, making it easy and stable to run.
- Rolling transmission is adopted in entire structrue instead of slide block and slide rod, which does not need lubricant and
decreases the wearing part.
- It's an environmental product whose noise is not more than 82dB(A).
- Low strength plastic yarn which is made from 100% regenerated plastic can be adopted to weave.
- It is high-efficient and energy economical. The highest rotation speed of the main motor can reach 180r/min and the power is1.5/2.2kw, which can save 10 thousand degree of electricity one year.
- It is the latest type circular loom
- As required, electronic intelligent fabric-lifting unit can be configured as well, which is featured the compensation setting tothe warp/weft density casually.
- Rolling transmission is adopted in entire structrue instead of slide block and slide rod, which does not need lubricant and
decreases the wearing part.
- It's an environmental product whose noise is not more than 82dB(A).
- Low strength plastic yarn which is made from 100% regenerated plastic can be adopted to weave.
- It is high-efficient and energy economical. The highest rotation speed of the main motor can reach 180r/min and the power is1.5/2.2kw, which can save 10 thousand degree of electricity one year.
- It is the latest type circular loom
- As required, electronic intelligent fabric-lifting unit can be configured as well, which is featured the compensation setting tothe warp/weft density casually.

Type | S-YZJ-750/6S | ZD-PC-4/750 | ZD-WYJ-4/750 | 70-YZJ-8/2100G | ZD-YZJ1-4/1200B | ZD-YZJ2-4/1500B | ZD-YZJ3-4/1700B |
Number of shuttle | 6 | 4 | 4 | 8 | 4 | 4 | 4 |
Folding width of weaving(mm) | 300-750 | 350-750 | 300-750 | 1400-2100 | 700-1200 | 1000-1500 | 1200-1700 |
Max. number of warp | 720 | 768 | 512 | 2016 | 960 | 1160 | 1360 |
Rotational speed of main motor (r/min) | 120-180 | 140-180 | 40-60 | 40-70 | 100-150 | 120-130 | 120-130 |
Production(m/min) | 1.8-2.7 | 1.4-1.8 | 0.8-1.8 | 1-1.5 | 1-1.6 | 1-1.6 | 0.75-1 |
Power of main motor(kw) | 2.2/3 | 1.5/2.2 | 2.7 | 10 | 2.2 | 3 | 3 |
Weight(kg) | 3000 | 1900 | 2900 | 5500 | 2500 | 2800 | 3000 |
L*W*H(m) | 9.1*2.41*3.1 | 8.3*2.2*2.73 | 7.5*2.4*2.73 | 17*3.5*4 | 8.5*2.2*2.7 | 8.5*2.2*2.7 | 2.5*2.9*2.96 |
Main Products
Company Information



Shipping & Packaging

FAQ
1. How long will your engineer reach our factory?
Within one week after everything ready (machine arrival your factory, non woven material, power source, air compressor
etc.Prepared)
2. How many days will you finish installing ?
We will finish installation and training within 15 days.
3. What should we charge for your engineer?
You should charge for the cost of our engineer's air tickets, hotel, food, and also their salary 80USD one day per person.
4. How long is your machine's warranty period?
All our machine have one year guarantee for electricity parts and two years guarantee for mechanism, starting from finished installation.
5. How could you do if the parts broken within warranty?
We would express the free replacement parts during the warranty date.
6. How could you do after one year warranty period?
We also can do service for you, but you need pay salary for our technicians 80USD/day for each person.
7. Does your engineer understand English?
Our engineers understand a little English. All our engineers have more than five years machine installation experience.
8. Can you help us find any engineer in our location?
Of course, we will check and inform you as soon as possible.
9. How do we solve the machine problem after your engineer leaving?
Generally speaking, there will be no problem after finishing installation. In case you have any problem, you can contact our sales at any time. Our engineers will take a solution video according your description.
Within one week after everything ready (machine arrival your factory, non woven material, power source, air compressor
etc.Prepared)
2. How many days will you finish installing ?
We will finish installation and training within 15 days.
3. What should we charge for your engineer?
You should charge for the cost of our engineer's air tickets, hotel, food, and also their salary 80USD one day per person.
4. How long is your machine's warranty period?
All our machine have one year guarantee for electricity parts and two years guarantee for mechanism, starting from finished installation.
5. How could you do if the parts broken within warranty?
We would express the free replacement parts during the warranty date.
6. How could you do after one year warranty period?
We also can do service for you, but you need pay salary for our technicians 80USD/day for each person.
7. Does your engineer understand English?
Our engineers understand a little English. All our engineers have more than five years machine installation experience.
8. Can you help us find any engineer in our location?
Of course, we will check and inform you as soon as possible.
9. How do we solve the machine problem after your engineer leaving?
Generally speaking, there will be no problem after finishing installation. In case you have any problem, you can contact our sales at any time. Our engineers will take a solution video according your description.
Contact Us
