SL-M001
Beverage, Clothing, Tools, Industrial, Warehouse Rack
Steel
Shelf
Multi-Level Racking
Adjustable
2000mm
200-800kg
Open
New Type
Common Use
Within 20 Days
L2000xd600xh2000mm
SGS/As4084/ISO9001
Blue+Grey/Orange/Yellow
200-800kg Per Level
Metal Decking Rack Shelf
Bolted-on/Welded-on
Sunli
Foam Film
standard size
China
7308900000
Product Description
Light Duty Warehouse Shelving System Metal Decking Rack Shelf




Please inform us following information to get prompt offer for shelf rack system
+ The dimensions of single rack unit ( or palletized load descriptions)
+ The palletized payload
+ Row of racks( single row, back-to-back row or multiple rows)
+ How many palletized load within one unit
( Please refer to the Product Description on the top)
FAQ
1, What is MOQ limitation for warehouse shelf rack ?
++ NO. But large purchase will bring competitive prices, 20FT container ( 10T~13T) is highly recommended, so that production can be better handled.
2, What is the lead time in Sunli?
++ As per 20FT container loading, manufacture time is about 21days; Regarding some customized items 25~27days will be covered.
3, What is payments methods Sunli can accept?
++ T/T and L/C are welcomed.
4, How about Sunli's sample delivery?
++ Short section of uprights and beams can be provided free of charge. But the freight will be collected upon your duty.
5, What is warranty for Sunli's rack system?
++ All rack items will be warrantied against manufacture's defects.
++ To avoid any shortage or missing components, we will provide 1%~2% spare parts besides basic ones.






Material | Q235B steel, cold roll forming |
Loading | 100kg-800kg per layer |
Structures | 1, Upright frames( 2 upright column and braces) 2, Beam with hanger( to hang into upright) 3, Support decking: MDF, steel plate 4, Section of upright: 55*45 section of beam: 80*60mm, 60*40mm 5, Thickness of steel: Beam: 1,2mm.1,5mm,1.8mm Upright: 1.5mm,1.8mm,2.0mm |
Size | 1, Normal size: L2000-D600-H2000 2, Length of beam: 1000mm-3600mm Depth: 400-1200mm Height of upright: within 5000mm |
Other features | 1, 50mm per pitch adjustable 2, Deliver time: within 2 weeks 3, Packing details: in plastic film 4, production capacity: 3000T per month |
Colour | 1, Upright: blue, orange, yellow, grey 2, Beam: orange, yellow, grey |
Other accessories | safety bins, bolts and screws |
MOQ | 2 Sets/units |




Please inform us following information to get prompt offer for shelf rack system
+ The dimensions of single rack unit ( or palletized load descriptions)
+ The palletized payload
+ Row of racks( single row, back-to-back row or multiple rows)
+ How many palletized load within one unit
( Please refer to the Product Description on the top)
FAQ
1, What is MOQ limitation for warehouse shelf rack ?
++ NO. But large purchase will bring competitive prices, 20FT container ( 10T~13T) is highly recommended, so that production can be better handled.
2, What is the lead time in Sunli?
++ As per 20FT container loading, manufacture time is about 21days; Regarding some customized items 25~27days will be covered.
3, What is payments methods Sunli can accept?
++ T/T and L/C are welcomed.
4, How about Sunli's sample delivery?
++ Short section of uprights and beams can be provided free of charge. But the freight will be collected upon your duty.
5, What is warranty for Sunli's rack system?
++ All rack items will be warrantied against manufacture's defects.
++ To avoid any shortage or missing components, we will provide 1%~2% spare parts besides basic ones.





