Login| Register| Forgot Password| Admin Panel Home| Mobile| Cart
VIP   Audited Supplier2 Years

Jiaxing Ouya Machinery Manufacturing Co., Ltd.  

Hydraulic jack; Hydraulic compressor; Hydraulic ram; Transmission jack; Shop press; Shop Crane

Search
Categories
Search
 
MadeInChina.com > Jiaxing Ouya Machinery Manufacturing Co., Ltd. > Product > 1000lbs Pneumatic Motorcycle Motocross Lift Table Motorcycle Dirt Bike Lift Stand
Product

1000lbs Pneumatic Motorcycle Motocross Lift Table Motorcycle Dirt Bike Lift Stand

价格 $249.00对比
发货 Zhejiang
销量 暂无
评价 已有 0 条评价
人气 已有 334 人关注
数量
+-
库存2000Pieces   起订20Pieces
IP UnknownLearn More
OY6003-Q
Quality Warranty
1year
One Cylinder Hydraulic Lift
1000lbs
Hydraulic
CE
/
/
Big Shear Type
New
Ouya
Four Post
220mm
780mm
2000*600mm
600*600mm
150kg
130kg
OUYA
Wooden Box Package
1000LBS
Jiaxing, China
842549900
Product Description
Product Description

This motorcycle lift is a real help!

This motorcycle lift is our hot seller. It is sturdy and can lift the motorcycle.

Company Profile

Jiaxing Ouya Machinery Manufacturing Co.,Ltd is a professional manufacturer of various hydraulic machinery and tools.And we are engaged in researching, designing and manufacturing of high-quality tools. The machines we produce have high quality,innovative structure and convenient operation. We have obtained ISO9001 certificate, and most of our products have CE certificate. Our products have received warm reception in the international market like Europe, the USA, Canada, Australia, Japan, Southeast Asia......
Our Advantages

 

Exhibitions

We participated in exhibitions all over the world.
And our products and services were welcomed and well received.

Certifications

Packaging & Shipping

PACKAGE: carton, wooden box, color box, iron box ......
 

FAQ
1. Are you a factory or a trading company?
We are an experienced manufacturer with our own factory.

2. How do I order?
First of all, select the products you are interested in and ask us for a quote.
Secondly, talk to our staff about product details, as well as quantities and prices.
Thirdly, sign the contract and pay the deposit.
Fourthly, mass production and shipment from factory.
Finally, pay the final payment and confirm receipt of goods.
After that, consider further cooperation.


3. How long does it take to produce and ship?
Typically, about 45 days of production time, and about 30 days of shipping time.

4. How do I confirm payment?
We accept wire transfer and PayPal payments as well as other payment methods.
Please contact us before using other payment methods.


5. Would you welcome a factory inspection?
Certainly, you are more than welcome to visit our factory.
We will provide you with considerate service.
And you will be more satisfied with our manufacturing strength.
You will also have more confidence in the competitiveness of our products.