Login| Register| Forgot Password| Admin Panel Home| Mobile| Cart
VIP   Audited Supplier13 Years

Beijing Oriental Yuhong Waterproof Technology Co., Ltd.  

Waterproof Materials, Coating, Polyurethane, Acrylic, Joint Sealant

Search
Categories
Search
 
MadeInChina.com > Beijing Oriental Yuhong Waterproof Technology Co., Ltd. > Product > One Component Polyurethane Waterproof Coating
Product

One Component Polyurethane Waterproof Coating

价格 $3.00对比
发货 Beijing
销量 暂无
评价 已有 0 条评价
人气 已有 291 人关注
数量
+-
库存300000KG   起订3000KG
IP UnknownLearn More
SPU-301
Black
Liquid
Polyurethane
Spray
Primer
Air Drying
ISO14001, CCC, RoHS
Concrete
Solvent
Yuhong
Iron Pail
China
3208901090
Product Description
SPU-301
One Component Polyurethane Waterproof Coating
 
Description
SPU-301 is a one component moisture-curing polyurethane waterproof coating
especially used for horizontal plane. When this coating is applied on surface substrate,
 it has chemical reaction with the moisture in the air, and then it will form a seamless

 
 
elastomeric rubber waterproof membrane.
 
Where to use
  • Undergrounds;
  • Parking garages;
  • Subways in open cut method;
  • Channels;
  • Kitchen or bathroom;
  • Floors, balcony and unexposed roofs;
  • Swimming pools, man-made fountain and other pools;
  •  
 
Top plate at plazas.
 
Advantages
  • Good tensile strength and elongation;
  • Both high and low temperature resistance;
  • Strong adhesive;
  • Seamless, no pinholes and bubbles;
  • Resistance to long-term water erosion;
  • Corrosion-resisting and mould-resisting;
  • Convenient to apply.
 
Standards
ASTM C 836
 
 
Packaging
SPU-301 is sealed in 20kg pails and transported in wooden cases. Each wooden case can be contained 36 pails of SPU-301.
 
Storage
SPU-301 material should be stored by sealed pails at dry and well-ventilated places and protected from sun or rain. The temperature in stored places can not be higher than 40° C. It can not be closed to fire sources. The normal shelf life is 6 months.
 
Transportation
SPU-301 is needed to be avoided sunshine and rain. Fire sources are forbidden during transportation.
 
Application System
  • Constructive System
The system is basically consisted of substrate, additional layer, waterproof coated membrane and protection layer.
  • Coverage
1.7kg per m2 gives dft 1mm minimum. Coverage may vary with the substrate condition during application.
 
  • Application Method
Surface preparation
Surfaces should be dry, stable, clean, smooth, without pockmarks or honeycombs and free from any dusts, oil or loose particles. Cracks and surface irregularities need to be filled by sealants and do additional waterproofing. For smooth and stable surfaces, this step can be skipped.
 
Additional layer
Paint SPU-301 as additional layer to enhance at internal and external corners, drain pipes, floor drains or embedded parts.
 
Application of waterproof coated membrane
It can use rubber scrapers or spray equipments to paint 2 or 3 times. After fully dry, it can be painted again. The normal time between each painting is 24 hour. The direction of second time painting needs to be perpendicular to the first time painting.
 
Application of protection layer
After waterproof coated membrane is fully dry and meets quality requirements, it can begin application of protection layer.
 
Notice
  • The temperature for application of SPU-301 should be above 5ºC.
  • SPU-301 needs to be consumed instantly and can not be diluted with solvent.
  • The storage and application places should be well-ventilated and no fire.