Login| Register| Forgot Password| Admin Panel Home| Mobile| Cart
VIP   Audited Supplier4 Years

Shenzhen Romanso Electronic Co., Ltd.  

LED High Bay Light, LED Work Light, LED Street Light, LED Flood Light, LED Stadium Light, Solar Street Light, LED Corn Light, LED Dock Light, LED Post Top Light

Search
Categories
Search
 
MadeInChina.com > Shenzhen Romanso Electronic Co., Ltd. > Product > Wholesale High Quality 20W 30W 50W 60W LED Work Flood Lights Dock Lighting with Swing Arm for ETL CE RoHS
Product

Wholesale High Quality 20W 30W 50W 60W LED Work Flood Lights Dock Lighting with Swing Arm for ETL CE RoHS

价格 $31.00对比
发货 Guangdong
销量 暂无
评价 已有 0 条评价
人气 已有 283 人关注
数量
+-
库存100Piece   起订1Piece
IP UnknownLearn More
Warm White
Warm White
IP65
20W/30W/40W/50W
Warehouse
Epistar
110-277V
AC
CREE 3030
CE, ETL, RoHS
30
>80
>0.9
Aluminum
Romanso or ODM
31.9*16.3*7cm
Product Description

 
Products Advantage:

* Optimum brightness for entire length of trailer.
* Built-in switch to control on-off. 
* Adjustable screw on the lamp, adjust lamp's angle by hand.
* Eliminates light bulb replacement and/or clean-up.
* Compact design utilizes aluminum housing for cooling system.
* High-visibility beam angles for optional.
* Cree/Epistar LED is available.
* Over 50000 hours lifetime and offer 5 years warranty.
* ETL/cETL/CE/RoHS certificates.

 

LED Dock Light Specifications:

 

Item NO.RMS-DL-20WRMS-DL-30WRMS-DL-40WRMS-DL-50W
Watt20W30W40W50W
Lumen2800LM4200LM5600LM7000LM
Dimension140mm*107.5mm201mm*119mm
Beam Angle15°/36°15°/36°/90°/120°
CCT3000K/4000K/5000K/5700K/6500K
VoltageAC100-277V, 50-60Hz
CRI>80
PF>0.9
IP RatingIP65

 

FAQ:
Q1: Are you a manufacture?

A: Yes, we have own factory and have been in providing professional solutions in LED Lighting over 13 years since 2007.

 

Q2. Can I have a sample order for led light?
A: Yes, we welcome sample order to test and check quality. Mixed samples are acceptable.

 

Q3. What about the lead time?
A: 1) Generally 5-7 working days for sample making.
    2) The delivery time of mass production will depend on quality, production craftwork, ect. Commonly it lasts 10-15 working days.

 

Q4: How do you ship the finished production?
A: 1) By sea
    2) By plane
    3) By DHL,FEDEX,UPS,etc.

 

Q5: How to deal with the faulty?
A: Firstly, our defective rate is less than 0.2%, so there is no big problem to the lights. Secondly, ROMANSO will replace or repair defective products within 5 years warranty upon our approved inspection of the returned products.

 

Q6. How to proceed an order for led light?
A: Firstly let us know your requirements or application.
Secondly We quote according to your requirements or our suggestions.
Thirdly customer confirms the samples and places deposit for formal order.
Fourthly We arrange the production.